![RDS Technology Loadmaster 8000i Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/rds-technology/loadmaster-8000i/loadmaster-8000i_operation_1424620006.webp)
PRO-SERIES ATHENE - VARIABLE RATE DRILL CONTROL
6
1.2
Work Cutout Wiring
Marker Sensors:
Lefthand Marker Sensor connected to "PL3-1" and
"PL3-4".
Move the righthand Marker Sensor wires ("D")
from "PL3-3" and "PL3-4" to "PL3-21" and PL3-22".
(Series to parallel).
Single Lift Sensor:
Connect to "PL3-1" and "PL3-4". Add a link wire
from "PL3-4" to "PL3-22".