![RDS Technology Loadmaster 8000i Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/rds-technology/loadmaster-8000i/loadmaster-8000i_operation_1424620010.webp)
PRO-SERIES ATHENE - VARIABLE RATE DRILL CONTROL
10
2.4
Settings menu
Figure 4: SET screen
2.5
Tramlining
2.5.1 Tramlining status/functions
The MAIN screen shows the current status of tramlining.
Tramline rhythm:-
Symmetrical
Assymmetrical left Assymetrical Right
The count is controlled by the operation of the markers.
2.5.2 Advancing the bout number
On starting up the instrument the tramline sequence always starts at ‘1’.
If necessary, press the key to select the correct current bout number, e.g. if entering work on a bout
other than bout 1 of the tramline sequence.
To display the current tramline rhythm (and starting bout no.), select the SETUP screen and press the
key (figure 5).
2.5.3 Holding the bout number
Press the key to hold the current bout number (e.g. to prevent the bout no. advancing if it is necessary
to take the drill out of work, or depending on the drill setup - lift a marker, to negotiate a field feature).
The icon indicates that the bout no. is held. Press the key to resume normal bout advance.
Working width
setting
Tramline
settings
Forward Speed
Calibration
Seed Calibration
Routine
Seed settings
Current bout
Target no. of
bouts