background image

Fi

d

b

b il

&

h

B il

M

l

Finned copper tube gas boilers & water heaters – Boiler Manual

9

F

F

GENERAL VENTING GUIDELINES

  The vent installation must be in accordance with Part 

7, Venting of Equipment, of the National Fuel Gas 
Code, ANSI Z223.1/NFPA 54-latest revision or 
applicable provisions of the local building codes. 
Canadian installations must comply with CSA B149.1 
or .2 Installation Code. Improper venting can result in 
excessive levels of carbon monoxide which can result 
in severe personal injury or death!

All vent systems must be fully supported by the building structure 
and not by the boiler/water heater. Appropriate thimbles and fire-
stops must be used where required.

  Common vent systems must be properly engineered 

and sized to provide a negative draft of .01 to 0.08 in, 
.25 to 2.0 mm W.C. at the flue outlet! Common positive 
pressure vent systems are not to be used. Improper 
installation can result in excessive levels of carbon 
monoxide which can cause severe personal injury or 
death!

  A single acting barometric damper must be installed 

directly to the boiler/water heater flue outlet to ensure 
proper operation. This does not apply to outdoor units 
or direct vent positive pressure units.

  Some venting applications may require the stop to 

be removed for smooth operation. The barometric 
damper should be located after the flue collector, refer 
to Figures 2, 3 and 7 for proper location. Be sure that 
the damper is mounted horizontally (never vertically). 
Carefully follow the instructions provided with the 
barometric damper. Check with local codes for specific 
requirements.

In Canada, B149 (7.25 Draft Regulators) states the 
damper shall be of double-acting type.

  To avoid spillage into the room of dangerous flue gas 

containing carbon monoxide, the opening in damper 
must never face against the flow of flue gas.

VENT SYSTEM OPTIONS 

The Dominator may be vented the following ways:

1) 

Vertical/Chimney Venting, Negative Pressure, Category 
I -

 uses an approved metal chimney system or properly lined 

masonry chimney. Combustion air is obtained from the space 
in which the unit is installed or from the outdoors. A barometric 
damper must be installed near the flue outlet when venting 
vertically. See Figures 6 and 7. This also applies to any fan-assisted 
chimneys or vents.

2) 

Direct Vent, Positive Pressure, Category III -

 for horizontal 

vent runs equivalent to 35 ft, 10.7 m or less. A stainless steel vent 
system certified to UL 1738 for installations in the United States, 
ULS636 for installations in Canada must be used when 
combustion air is ducted from outdoors, from the same wall.

3) 

Horizontal Vent, Negative Pressure, Category I -

 for 

horizontal vent runs equivalent to more than 

35 ft

10.7 m

 (90 

degree elbow equals 10 equivalent feet). A dedicated wall 
mounted power venter and barometric damper must be used. 
The vent system can be single wall galvanized steel or type B vent 
pipe. Combustion air is obtained from the space in which the unit 
is installed or from the outdoors.

 

A barometric damper must be installed when the horizontal run 
is longer than 35 equivalent feet. (90 degree elbow = 10 equivalent 
feet). If this is the case, a power venter must also be used.

 

If horizontal run is less than 35 equivalent feet, do not  use a 
barometric damper. Follow applicable instructions under the 
"COMBUSTION AIR & VENTILATION" section. 

4)  Outdoor Installation - uses the outdoor option kit. Barometric 

damper is not required.

  All venting, combusiton air material supplied by 

installer. All venting material must be approved for 
the application. Consult the vent manufacturer’s 
product literature.

Содержание DOMINATOR Series

Страница 1: ...on dust and particulate particularly drywall dust will cause contamination of the burner resulting in possible severe personal injury death or substantial property damage The boiler can only be operat...

Страница 2: ...ion or in the absenceofsuchrequirements totheNationalFuelGasCode ANSI Z223 1 NFPA 54 latest revision Where required by the authority having jurisdiction the installation must conform to the Standard f...

Страница 3: ...a chimney or outside wall and have adequate fresh air for combustion Ensure that the boiler water heater is level from front to back and from side to side Use metal shims to level the boiler water hea...

Страница 4: ...ts of all such devices Never operate the Dominator in an environment subjected to a negative pressure unless the air intake is connected to the outdoors Failure to comply with this warning can result...

Страница 5: ...F Figure 2 Vertical Venting using a Masonry Chimney and Inside Air Figure 3 Horizontal Venting using Inside Air 1 5 FT 0 5 m 1 4 IN PER F00T 20 mm m 305 TO 457 127 TO 254 VENT PIPE DIAMETER 5 TO 10 1...

Страница 6: ...s sectional area of not less than 1 in2 per 7 000 Btuh 310 mm2 per kW up to and including 1 million Btuh plus 1in2 per14 000Btuh 155mm2 perkW inexcessof1million Btuh Intake Air Option General Guidelin...

Страница 7: ...e or multiple units exhaust and combustion air terminals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds In cold climates double wall...

Страница 8: ...mbustion Air and Venting Metal Chimney System Shown Locate exhaust terminal downwind from air intake to reduce potential for flue gas recirculation Figure 7 Combination Air Intake and Venting Masonary...

Страница 9: ...ype To avoid spillage into the room of dangerous flue gas containing carbon monoxide the opening in damper must never face against the flow of flue gas VENT SYSTEM OPTIONS The Dominator may be vented...

Страница 10: ...at a minimum rate of 1 4 in ft 20 mm m On masonry chimneys the connector must terminate flush with the inside of the chimney flue Figure 2 Fasten each single wall vent connection with at least 3 corro...

Страница 11: ...ymustbesupported at3ft 0 9 mintervalswithoverheadhangers Theventsystemmust be pitched down toward the vent terminal 1 4in ft 20 mm m If anypartofasinglewallmetalventsystempassesthroughanunheated space...

Страница 12: ...agrosseretl inclinaisonhorizontalequiconviennent ets assurerquelesyst meestexemptd obstruction d tranglement de fruite de corrosion et autres d faillances qui pourraient pr senter des risques c Insofa...

Страница 13: ...ce F du National Fuel Gas Code ANSI Z223 1 NFPA 54 et ou des codes d installation CAN CGA B149 GENERAL PIPING REQUIREMENTS Improper piping of this boiler water heater will void themanufacturer swarran...

Страница 14: ...4 0 0 22 2 1 0 6 400 45 4 0 49 2 9 1 5 600 68 1 1 30 4 3 3 8 750 85 1 2 35 5 4 6 9 900 102 1 3 84 6 4 11 3 1050 119 1 6 23 7 5 18 4 T 20 F T 11 1 C Model Flow Rate Pres Drop Flow Rate Pres Drop Number...

Страница 15: ...trol thermal expansion must be installed in the heating system An expansion tank must be installed close to the boiler on the suction side of the pump An air scoop and automatic air vent must also be...

Страница 16: ...ized to boiler design flow requirements 3 All boilers furnished with factory mount ed outlet water temperature gauge 4 Boiler pump purging required Use termi nals supplied Notice These drawings show s...

Страница 17: ...otice These drawings show suggested piping configuration and valving Check with local codes and ordinances for specific requirements Adjustment Procedure To Maintain Inlet Temperature Above Dew Point...

Страница 18: ...solved solids not exceeding 350 ppm Water having a hardness less than 8 grains can cause excessive errosion of the heat exchanger Waterthathasahardnessgreaterthan18grainspergallon and or a level of di...

Страница 19: ...Fi d b b il h B il M l Finned copper tube gas boilers water heaters Boiler Manual 19 F F Table 8A Dominator Heat Exchanger Selection Graph Table 8B Dominator Pumping Performance Requirement...

Страница 20: ...rvoidingthewarranty Themethodoutlined below can be employed to prevent this condition from occurring A balancing valve should be installed on the outlet side of the water heater for purposes of adjust...

Страница 21: ...e making selection 6 Common piping must be sized for maximum combined heater flow 7 Hot water tanks should be equipped with a combination temperature pressure relief valve 8 MA Code requires an 1 8 ho...

Страница 22: ...y Maximum pipe capacity in ft3 hr based on 0 60 specific gravity gas at a pressure of 0 5 psig or less and a 0 3 WC pressure drop Nominal Iron Pipe Size in Pipe length in feet 10 20 30 40 50 60 80 100...

Страница 23: ...y understand the instructionscontainedinthismanual Donotattempt to operate this boiler water heater if it has not been installed in accordance with the guidelines set forth in this manual Failure to c...

Страница 24: ...ever the boiler water heater is in operation Consult the staging controller documentation for further information on controller operation For the D1050 D2100 the air inlet plenum is divided into left...

Страница 25: ...ule No Power to Right Valve 3 No Power to Ignition Module Low Right Valve 4 No Power to Ignition Module High Right Valve OPERATION SEQUENCE 2 STAGE D300 THROUGH D900 On Models D1050 2100 2 stage facto...

Страница 26: ...n for details 2 A powered alarm contact 2A max 24 VAC is available to provide an audio or visual indication of faults related only to the staging control s operation This contact is wired to the junct...

Страница 27: ...sure switches and gas valves will be switched or turned off as required Stage 1 will be on first last and whenever the boiler operates For a change from stage 2 to 3 or 3 to 4 10 second DOM time delay...

Страница 28: ...ousservirdest l phones se trouvant dans le b timent Appelez imm diatement votre fournisseur de gaz depuis un voisin Suives les instructions du fournisseur Si vous ne pouvez rejoindre le fournisseur ap...

Страница 29: ...site requirements Table 19 Pilot Manifold Settings Natural Gas inches W C mm W C Low Fire 1 5 02 33 5 High Fire 2 5 0 2 63 5 LP Gas inches W C mm W C Low Fire 3 9 0 2 99 5 High Fire 9 3 0 2 236 5 Tabl...

Страница 30: ...s by more than 5 from the rated input value of the unit adjust the manifold pressure accordingly DO NOT adjust the manifold pressure by more than 5 If a properratecannotbemaintainedwithoutadjustingthe...

Страница 31: ...ermal radiation or in a drafty area will cause poor or sporadic heating For a thermostat that employs an adjustable heat anticipator adjust the anticipator to match the current measured in the thermos...

Страница 32: ...or is required to properly control the system supply primary loop temperature The firing stages are operated to provide a setpoint temperature in the primary loop SETPOINTOPERATION Thecontroloperatest...

Страница 33: ...echnician in accordance with all applicable localandnationalcodes Improperservicingoradjust ment can damage the boiler water heater Theceramiccombustionchambercontainscrystalline silica Wear a tightly...

Страница 34: ...1 4 inch nuts and washers holding the upper com bustion chamber front panel in place and carefully remove it 9 Carefully slide the heat exchanger out of the unit 10 Remove the V baffle straps and V ba...

Страница 35: ...weep or discharge water at normal system pressure If it does contact a qualified service technician to have it inspected NEVER try to clean or repair the relief valve If the valve fails to operate pr...

Страница 36: ...nter contact not wired Wire power venter contact to J box Power venter not wired to external power Wire power venter as shown in connection diagram Relay fault Replace relay Power venter fault Replace...

Страница 37: ...lace main valve s Insufficient Heating Target temperature too low Increase stage control target temperature Primary safety high limit set too low Increase limit setting Unit Consistently Shuts Down Pr...

Страница 38: ...Fi d b b il h B il M l Finned copper tube gas boilers water heaters Boiler Manual 38 F F Figure 23 Replacement Parts RIOM 22 REV B REPAIR PARTS...

Страница 39: ...2723 1 70 2724 1 70 2725 1 Jacket Lower Front Panel SS 70 2716 1 1 70 2717 1 1 70 2718 1 1 70 2719 1 1 70 2720 1 1 70 2721 1 1 70 2722 1 1 70 2723 1 1 70 2724 1 1 70 2725 1 1 Handle 20 0050 1 1 1 1 1...

Страница 40: ...1 1 1 1 Jacket Right Panel SS 03 1823 1 1 1 1 1 03 1825 1 1 1 1 1 1 1 7 Combustion Air Inlet Assembly Indoor 70 2744 1 1 70 2746 1 1 70 2748 1 1 70 2749 1 1 1 1 Combustion Air Inlet Assembly Outdoor 7...

Страница 41: ...07 1 03 1808 1 03 1809 1 03 1810 1 Jacket Top Panel SS 03 1801 1 1 03 1802 1 1 03 1803 1 1 03 1804 1 1 03 1805 1 1 03 1806 1 1 03 1807 1 1 03 1808 1 1 03 1809 1 1 03 1810 1 1 Jacket Top Panel Outdoor...

Страница 42: ...se Panel 03 1974 1 03 1975 1 03 1976 1 03 1977 1 03 1978 1 03 1979 1 03 1980 1 03 1981 1 03 1982 1 03 1983 1 Cerablanket Insulation 05 0103 3 4 4 6 6 8 10 10 10 10 Manning Glass Insulation per square...

Страница 43: ...771 1 1 1 1 1 1 1 1 1 1 19 Heat Exchanger Guide Rail 03 1938 4 4 4 4 4 4 4 4 4 4 20 Combustion Chamber Rear Panel 03 1904 1 03 1905 1 03 1906 1 03 1907 1 03 1908 1 03 1909 1 03 1910 1 03 1911 1 03 191...

Страница 44: ...03 1 05 0204 1 05 0205 1 05 0206 1 05 0207 1 05 0208 1 05 0209 1 05 0210 1 05 0211 1 26 End Refractory Panel Right 05 0058 1 1 1 1 1 1 1 1 1 1 End Refractory Panel Left 05 0107 1 1 1 1 1 1 1 1 1 1 28...

Страница 45: ...and fittings 70 2896 1 1 1 1 1 1 1 1 1 1 NS Burner Gasket 06 0020 4 6 8 10 12 14 18 20 26 28 NS Burner Support Rail 03 2090 1 03 2091 1 03 2092 1 03 2093 1 03 2094 1 03 2095 1 03 2096 1 03 2097 1 03...

Страница 46: ...0 2845 1 Heat Exchanger Assembly Cupronickel 70 2856 1 Bronze Headers 70 2857 1 70 2858 1 70 2859 1 70 2860 1 70 2861 1 70 2862 1 70 2863 1 70 2864 1 70 2865 1 32 Tube Bundle Copper 70 2901 1 70 2902...

Страница 47: ...E DB 14 0112 1 1 1 1 1 1 1 1 1 1 High Limit L4008E DW 14 0105 1 1 1 1 1 1 1 1 1 1 NS Operator T6031A pool heater Canada Only 14 0003 1 1 1 1 1 1 1 1 1 1 44 Firing Valve 3 4 11 0461 1 1 Firing Valve 1...

Страница 48: ...lve 50 30 0379 1 1 Pressure Relief Valve 125 13 0009 1 1 1 1 1 1 1 1 1 1 NS Tridicator DB 30 50 psi 13 0308 1 1 1 1 1 1 1 1 1 1 Tridicator DB 60 160 psi 13 0305 1 1 1 1 1 1 1 1 1 1 NS Flow Switch 14 0...

Страница 49: ...300 400 600 750 900 1050 1350 1500 1950 2100 NS Barometric Damper 6 09 0405 1 1 Barometric Damper 7 09 0409 1 Barometric Damper 8 09 0404 1 Barometric Damper 10 09 0403 1 1 Barometric Damper 12 09 04...

Страница 50: ...bottom of the electrical panel Disable any external call for heat and toggle the remote local switch to REMOTE 1 Toggle the LOW FIRE switch to cycle the boiler then hold at trial for pilot ignition 2...

Страница 51: ...E DELTA T BETWEEN THE HEATER INLET AND OUTLET IS CRITICAL TO PROPER FLOW BEFORE YOU LEAVE THE JOBSITE YOU MUST RECORD THE DELTA T THIS READING SHOULD NOT EXCEED 35 F 19 4 C NOR BE LOWER THAN 20 F 11 2...

Страница 52: ...terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRU...

Страница 53: ...bes caused by high water velocity through the tubes and is not covered by the manufacturer s warranty See Installation Instructions for proper pump performance Chemical corrosion no corrosive chemical...

Страница 54: ...Fi d b b il h B il M l Finned copper tube gas boilers water heaters Boiler Manual 54 F F...

Страница 55: ...Fi d b b il h B il M l Finned copper tube gas boilers water heaters Boiler Manual 55 F F...

Страница 56: ...t 2008 Mestek Inc 260 North Elm Street 7555 Tranmere Drive Westfield MA 01085 Mississauga Ontario L5S 1L4 Canada Phone 413 568 9571 Phone 905 670 5888 Fax 413 568 9613 Fax 905 670 5782 www rbiwaterhea...

Отзывы: