Change Over Box
138--119
16
3769DOC000002
Edition: April 06, 2005
3.2
Connecting the Change Over Box to the STD22--System
Detailed terminal designations, cable connections, cable types are to be established
according to the wiring diagram (138--119.HP008), the actual cable and connection dia-
grams as well as the manual of the Distribution Unit 138--118.
3.2.1
Connecting the supply voltage
(see also section 4.3 -- Redundant voltage supply).
Voltage supply is effected by connecting the 24 V DC supply voltage via 2 fuses
( 6,3 A, 24 V) to the terminal board of the Change Over Box.
(see also Change Over Box wiring Diagram 138--119.HP008 ).
3.2.1.1
Voltage supply of the connected receiver
The connected receivers can be supplied with operating voltage (24 V DC) out of the
Change Over Box independent of the signal lines.
For that purpose supply lines to the receivers have to be connected at the terminal board
(terminals 3 to 13) of the Change Over Box. These terminals are fuse--protected.
Terminals 3 to 10 are fitted with fuses 1 A, 24 V (it is to connect the supply voltage for only
one receiver).
Terminal 11 to 13 are fitted with fuses 2 A, 24 V (it is to connect the supply voltage for up to
two receivers).
Содержание 138-119
Страница 16: ...Change Over Box 138 119 10 3769DOC000002 Edition April 06 2005 intentionally left blank...
Страница 50: ...Change Over Box 138 119 44 3769DOC000002 Edition April 06 2005 intentionally left blank...
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......