Raypak WH 0135A Скачать руководство пользователя страница 22

22

Repair Section

Tube Cleaning Procedure (Typical)

Establish a regular inspection schedule, the frequency
depending on the local water condition and severity of
service. Do not let the tubes clog up solidly. Clean out
deposits over 1/16" in thickness.

The heater may be cleaned from the side opposite the
water connections, without breaking pipe connections.
It is preferable, however, to remove both headers for
better visibility through the tubes and to be sure the
residue does not get into the system. Generally, you
do not remove the top pan or the heat exchanger .

After reaming with the auger, mount the wire brush
and clean out the debris remaining in the tubes.
Another method is to remove the heat exchanger,
ream tubes and immerse heat exchanger in non-inhib-
ited de-scale solvent.

Heat Exchanger Removal

1.  Shut water, gas and electricity off, close valves

and relieve pressure, remove relief valve. Remove
side inspection panels.

2.  Remove top holding screws.
3.  Remove draft diverter, lift and remove top and flue

collector on stack type models. Remove inspec-
tion panels.

4.  Loosen bolts and disconnect flange nuts on inlet-

outlet header, loosen union(s) at gas pipe, and
slide heater away from piping until studs clear the
heater.

5.  Remove heat exchanger corner brackets.
6.  Remove combustion chamber clips at the four cor-

ners of the heat exchanger.

7.  Lift heat exchanger straight up using caution not to

damage refractory.

Heat Exchanger Re-Assembly

1.  Heat exchanger water header O-rings should be

replaced with new ones.

2.  Install inlet-outlet and return water headers and

install header retainer nuts and torque nuts even-
ly.

3.  Replace "V" baffles.
4.  Install thermostat sensing bulbs in header wells

and replace bulb retaining clips.

5.  Install inlet and return pipes in water headers

using pipe thread sealant.

6.  Install water pressure relief valve, sensor probe,

and low water cutoff devices if so equipped.

7.  Open water supply and return shut-off valves. Fill

heater and water piping system with water. Check
heater and piping system for leaks at full line pres-
sure. Run system circulating pump for a minimum
of 1/2 hour with heater shut-off.

8.  Shut down entire system and vent all radiation

units and high points in system piping. Check all
strainers for debris. Expansion tank water level
should be at the 1/4 mark and the balance of the
tank filled with air (when using Air-X-Tank).

9.  Install flue collector, jacket top and inspection pan-

els. Install top holding screws. Install draft diverter
and vent piping if so equipped.

10.  If gas piping was disconnected, reconnect gas pip-

ing system and check for leakage using a soap
solution.

11.  Check for correct water pressure and water level

in the system. Make sure that system pump oper-
ates immediately on the call for heat. The system
is ready for operation.

12. Within two (2) days of start-up, recheck all air

vents and expansion tank levels.

Combustion Chamber Removal

To remove combustion chamber you must first have
removed the heat exchanger. Unbolt metal combus-
tion chamber retainer from top and remove
combustion chamber panels individually.

Fig. 19: Refractory Panels—Top View

RAYPAK TUBE CLEANING KIT

h

s

u

r

B

 

e

r

i

W

p

i

T

 

e

d

i

b

r

a

C

 

h

t

i

w

 

r

e

g

u

A

 

 

 

 

 

 

 

)

5

(

 

s

e

c

e

i

P

 

n

o

i

s

n

e

t

x

E

Fig. 18: Raypak Tube Cleaning Kit

Содержание WH 0135A

Страница 1: ...in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department WARNING If the informa...

Страница 2: ...agraph 3 of the GENERAL SPECIFICATIONS section on page 6 Fig 7 on page 12 the Wiring Diagrams on pages 14 and 15 Fig 8 on page 16 Fig 12 on page 19 Fig 15 on page 20 the TROU BLESHOOTING chart on page...

Страница 3: ...iring 13 Wiring Diagram Standing Pilot Models 0090 0135 0195 14 Wiring Diagram IID Models 0090 0135 0195 15 CONTENTS 3 SERVICING PROCEDURES 16 Sequence of Operation 16 Start up Procedures 16 Repair Se...

Страница 4: ...Read and follow water heater warnings and instructions If owners manual is missing contact the retailer or manufacturer DANGER Failure to install the draft hood and properly vent the water heater to...

Страница 5: ...ting temperature at water heater Feel water before bathing or show ering Temperature limiting valves are available see manual Table A details the relationship of water temperature and time with regar...

Страница 6: ...design certified by the and tested under the requirements of the American National Standard ANSI Z21 10 3 Each heater has been constructed and pressure tested in accordance with the requirements of S...

Страница 7: ...4 5 WH 0135 135 132 80 1 1 4 1 2 18 6 1 4 6 WH 0195 195 192 80 1 1 4 1 2 18 6 1 4 7 Recovery gph based on manufacturer s rating May be used with other tank size capacity Table B Specifications and Di...

Страница 8: ...strict air flow Heater Side Minimum Distance from Combustible Surfaces Floor Combustible Front Alcove Back 6 in Right 6 in Left 6 in Top Indoor 16 in Top Outdoor Unobstructed Flue Vent 6 in Except for...

Страница 9: ...the roof more than five feet should be securely guyed or braced to withstand snow and wind loads We recommend use of insulated vent pipe spacer through the roofs and walls Model No Sq in of Each Free...

Страница 10: ...iction leakage corrosion and other deficiencies which could cause an unsafe condition c Insofar as is practical close all building doors and windows and all doors between the space in which the applia...

Страница 11: ...5 300 400 560 0135 15 40 60 150 150 200 0195 20 35 70 100 100 400 Natural gas 1000 BTUH ft 60 specific gravity 0 5 in WC pressure drop Propane gas 2500 BTUH ft 1 53 specific gravity 0 6 in WC pressure...

Страница 12: ...Pressure Specifications Water Connections System Piping The pipe size and fittings between the heater and the tank should be at least 1 for model 0090 and 1 1 4 for models 0135 and 0195 This is based...

Страница 13: ...e and pressure gauge is standard equipment on all hot water heaters All temperature and pressure gauges are shipped loose for field instal lation in the outlet water connection see Fig 7 All fittings...

Страница 14: ...14 Wiring Diagram Standing Pilot Models 0090 0135 0195...

Страница 15: ...15 Wiring Diagram IID Models 0090 0135 0195...

Страница 16: ...y turning off power to the module for one minute When the pilot flame is established flame rectification circuit is completed between the sensor and burner ground The flame sensing circuit in the modu...

Страница 17: ...ased stop and immediately call your service technician or gas supplier If the pilot does not stay lit after several tries turn the gas control knob to OFF and call your service technician or gas suppl...

Страница 18: ...and to replace any part 18 If red reset button does not pop up when released STOP and immediately call your service technician or gas supplier If the pilot does not stay lit after several tries turn...

Страница 19: ...mell gas STOP Follow b in the safety information previously stated If you do not smell gas go to the next step 8 For Honeywell Gas Valve Turn gas control knob counter clockwise to ON For Robertshaw Ga...

Страница 20: ...95 For Automatic Ignition Systems 1 Turn on power to the ignition systems and turn gas supply off at the gas valve 2 Check ignition module as follows a Set the tankstat to high setting b Watch for con...

Страница 21: ...of burners or around outer jacket indicates a need for cleaning 1 Lift off draft hood and flue collector by removing bolts and screws 2 Remove V baffles from heat exchanger 3 Remove burner tray see Bu...

Страница 22: ...t outlet and return water headers and install header retainer nuts and torque nuts even ly 3 Replace V baffles 4 Install thermostat sensing bulbs in header wells and replace bulb retaining clips 5 Ins...

Страница 23: ...ll out switch is open 6 Manual Reset High limit is open 7 Defective ignition module or defective gas valve SOLUTION S 1 Check circuit breakers disconnect switch Make sure power is on 2 Check continuit...

Страница 24: ...Refer to installation instructions regarding combustion air requirements 2 Refer to installations instructions 3 See yellow flame section above 3 Pilot Outage Standing pilot models 4 Yellow lazy flame...

Страница 25: ...ls Wiring errors can cause improper and dangerous operation Verify proper operation after servicing DANGER SHOCK HAZARD Make sure electri cal power to the heater is disconnected to avoid potential ser...

Страница 26: ...cement 1 Shut off electrical power to the heater 2 Shut off water supply and open drain valve to remove water in the piping at the pump level 3 Disconnect wiring and conduit connections to the pump 4...

Страница 27: ...anufactured by it but Raypak will apply any such warranty as may be provided to it by the parts manufacturer TO MAKE WARRANTY CLAIM Promptly notify the original installer supplying the model and seria...

Страница 28: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...

Отзывы: