CONNECTIONS
– PLUMBING
22
Mechanical, Hydronic and Process Heating Applications
For these applications, storage tanks are normally not required. Connect the water heaters and pumps in
accordance with the principles shown in the diagram below with the following in mind:
Install the water heaters according to
“
Equa-flow® principles
” detailed on page
20
.
A disconnection union must always be provided at the cold water inlet and hot water outlet on the water heater
to allow for disconnection of the water heater.
Each high point of the system should be fitted with an air bleed valve or automatic air eliminator.
On radiator or heating systems where thermostatic or zone valves will vary the water flow through the load, a
by-pass with a suitable control valve must be installed to control the system water flow rate.
BYPASS
VALVES must be installed at the end of the system furthest from the water heater.
Typical Installation
– Raypak Mechanical Heating System
Содержание B0507
Страница 26: ...CONNECTIONS ELECTRICAL 26 Wiring Diagram for Typical BMS System Interface ...
Страница 28: ...CONNECTIONS ELECTRICAL 28 WIRING DIAGRAMS ON OFF MODELS 1000MJ NG ...
Страница 29: ...CONNECTIONS ELECTRICAL 29 ON OFF MODELS 1000MJ LPG ...
Страница 30: ...CONNECTIONS ELECTRICAL 30 ON OFF MODELS 1000MJ ...
Страница 31: ...CONNECTIONS ELECTRICAL 31 MODULATING MODELS 1000MJ NG DRAWING No 96159611B ...
Страница 32: ...CONNECTIONS ELECTRICAL 32 MODULATING MODELS 1000MJ LPG DRAWING No 96159610C ...
Страница 33: ...CONNECTIONS ELECTRICAL 33 MODULATING MODELS 1000MJ DRAWING No 96159613B ...
Страница 55: ...55 This page is intentionally blank ...