4) Next, close the upstream manual gas valve and remove the manometers from test point A and from test point B.
Connect a rubber tube from test point A to test point B and open the upstream manual gas valve. Make sure that test
points A & B have been opened so as to allow gas to flow. This will bring pressure to the second valve seat.
5) Open test point C and connect a second rubber tube to it. Connect the other end of the tube to a manometer and
look for a build up of pressure. Increasing pressure indicates a leaking gas valve.
6) Remove rubber test tube and manometers. Close each test point valve as the tubes are removed.
7) Connect a manometer to each test point (one at a time) and look for a build up of pressure. If a build up of pressure is
detected, check each test point valve to see if it is tightly closed. If leak persists, replace test point valve(s).
8) After no leakage has been verified at all valve seats and test valves, open downstream leak tests valve and restore
electrical power to boiler.
This completes leak testing for a single Hi Delta manifold riser. Repeat steps 1-8 for each riser.
58
Содержание 302-902
Страница 7: ...7 General Information ...
Страница 49: ...49 WIRE DIAGRAM MODEL 302 402 Reference Drawing Number M152462 Rev M H4 W1 ...
Страница 50: ...WIRE DIAGRAM MODEL 302 402 Reference Drawing Number M152470 Rev J H3 W3 50 ...
Страница 51: ...51 WIRE DIAGRAM MODEL 502 752 Reference Drawing Number M152464 Rev R H3 HW3 ...
Страница 52: ...WIRE DIAGRAM MODEL 902 Reference Drawing Number M152465 Rev P H3 W3 52 ...