Chapter 2: Installing the system
29
2.11Final checks
When you have completed all necessary installation procedures, but before you
apply power to the system, ensure all equipment and connections are properly
secured.
Secure all cables
To prevent strain on the connector blocks, secure the cables to the Course Computer
with cable ties as shown below.
2.12Commission the system before use
The SPX-5 Tiller system must be commissioned prior to use, in accordance with the
instructions in
Chapter 3: Commissioning & setup
. For new systems this involves
calibrating the system, which is a safety-critical action.
D10396-1
Содержание SmartPilot X5
Страница 1: ...SmartPilot X5 Tiller GP Tiller Installation Setup Guide Document reference 87075 3 Date August 2008 ...
Страница 38: ...30 SmartPilot X 5 Tiller GP Tiller Installation Setup Guide ...
Страница 52: ...44 SmartPilot X 5 Tiller GP Tiller Installation Setup Guide ...
Страница 68: ...60 SmartPilot X 5 Tiller GP Tiller Installation Setup Guide ...
Страница 72: ...64 SmartPilot X 5 Tiller GP Tiller Installation Setup Guide ...
Страница 76: ......