3.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
28
Содержание RVX1000
Страница 2: ......
Страница 4: ......
Страница 8: ...8...
Страница 14: ...14...
Страница 48: ...Example Extended RealVision system 48...
Страница 54: ...54...
Страница 74: ...74...
Страница 75: ...Chapter 5 Mounting Chapter contents 5 1 Mounting on page 76 Mounting 75...
Страница 86: ...86...
Страница 90: ...90...
Страница 106: ......
Страница 107: ......