IMPORTANT: DURING CLEANING CARE MUST BE
TAKEN NOT TO DAMAGE THE FIBRE INSULATION.
SEE FIG. 5
1.
Lift insulation covers and remove 4 fixing screws.
2.
Using lifting hooks provided, remove hotplate.
SEE FIG. 6
3.
Remove 2 flue cleaning access door securing bolts
and remove door.
4.
Remove the boiler flueway baffles from between boiler
cross waterways.
The baffles are assembled in alternate directions, to allow
gases to flow front to back through the assembly.
Each heat exchanger has two rows of baffles.
Total number of baffles fitted are:-
800 = 6
2 x 3
8120 = 6
2 x 3
8150 = 6
2 x 3
7
HEAT EXCHANGER CLEANING
Cleaning
FIG. 5
FIG. 6
FIG. 7
FIG. 8
DESN 514438
DESN 514434
DESN 514433
DESN 514432
Содержание Heatranger 880K