background image

It is important that a 6 monthly service be carried out by
a competent Service Engineer and it is recommended
that a contract be made with such an Engineer. Your
Rayburn Stockist will provide advice on the location of
the nearest Servicing Engineer,
With normal use, cooker annual flueway clean and
burner maintenance should be carried out immediately
before and after the end of the heating season. An
additional cooker flueway clean, halfway through the
heating season, may be necessary in some cases.

The householder should be advised to turn OFF

the

cooker oil valve control knob, the night preceding the
day of the service, so that the appliance will have
cooled down by the following morning, in readiness for
servicing.
Before commencing any servicing, isolate the oil supply
from the tank and ensure the oil control valve front trip
lever if 

OFF

.

a. Service clean of cooker boiler heat exchanger 

flueways.

b. Service clean of cooker flueways and hotplate.
c. Service maintenance clean/check of oil burner.
d. Maintenance check on oil control valve.

1. To obtain servicing access to oil burner and heat 

exchanger, proceed as follows:-
a. Lift out the hotplate.
b. Open the outer burner door and lift out the inner 

combustion chamber door.

2. a. Break and disconnect the copper feed pipe at the 

front elbow of burner. Any residue oil in the 
copper pipe should be collected by a small tray 
receptacle.

b. Lift out burner and remove the burner heat baffle, 

shell assembly, small vapourising chamber plate 
and wicks.

c. Remove carbon deposit from wick grooves, 

oilways of burner base and the oil feed pipe. 
Gently brush any carbon deposits from shell 
assembly and top heat baffle.
Check the burner wicks and replace in the reverse 
order of dis-assembly.

NOTE:

EXAMINE THE VAPOURISING CHAMBER

PLATE IS FITTED CORRECTLY, THE LIGHTING
PORT  IS AT THE FRONT OF THE SHELL
ASSEMBLY AND THAT THE SHELLS ARE SEATED
CORRECTLY ON THE BASE, REPLACE THE HEAT
BAFFLE, BUT DO NOT OFFER BURNER ASSEMBLY
TO APPLIANCE YET.

3. Remove oil burner assemblies as previously
described.

a. Place a layer of paper in combustion chamber 

base plate.

b. Thoroughly brush boiler rear face and cooker LH 

side in an upward and downward direction. Brush 
across the oven top.

c. Remove layer of paper with fallen debris.
d. Brush and clean in between hotplate ribs on 

underside.

e. Examine soft rope seal located on underside of 

hotplate baffle plate, and replace if worn or frayed.

f. Examine soft rope seal located around hotplate  

aperture in top plate. Replace if frayed or 
damaged.

g. Examine soft seal rope located around inner 

combustion chamber door. Replace if frayed or 
damaged.

h. Replace hotplate ensuring that the underside fins 

lie over the combustion chamber.

i. Replace the oil burner assembly within the 

combustion chamber, and re-connect the copper 
oil pipe to elbow.

NOTE:

ENSURE THE COPPER PIPE IS NOT KINKED

OTHERWISE AIR LOCKING WILL PREVAIL.

4. Check that the inlet valve from the oil tank is closed.

a. Remove the oil filter from the front of the oil 

control valve, draining the oil into a prepared 
receptacle.
Clean the filter if necessary in kerosene or warm 
water and dry off. Inspect the sealing gasket of 
the filter and renew if necessary.
Replace filter assembly within oil control valve.

b. Inspect and clean if necessary any filter on the oil 

supply tank to the oil control valve of the cooker.
Flush the oil supply pipe and ensure it is not air 
locked.

c. Remove top cover of oil control valve, remove 

metering stem and clean, then check sealing 
grommet is satisfactory. Replace if worn. 
After refitting metering stems, ensure it is 
operating freely under the spring tension.

5. a. Open main oven door fully and remove four 

screws securing inner lining panel to outer door 
casting.

b. Remove inner lining panel and slagwood 

insulation.

c. Unscrew two hexagon nuts securing indicator to 

outer door casting, and remove indicator.

d. Fit replacement indicator in reverse order of 

dismantling.

6. Check the oil rates of burner at low and high fire 

rates together with smoke sampling.

SERVICING INSTRUCTIONS

BI-ANNUAL SERVICING

STANDARD BI-ANNUAL SERVICE SCHEDULE

TO OBTAIN SERVICING ACCESS

TO REMOVE OIL BURNER

TO CLEAN THE FLUEWAYS

TO CHECK THE OIL CONTROL VALVE

TO REMOVE OVEN TEMPERATURE INDICATOR

LEAVE SERVICING INSTRUCTIONS WITH THE

USER FOR FUTURE USE

10

Содержание Cookmaster 200K

Страница 1: ...WARNING This information is a copy of an original archive therefore Aga cannot be held responsible for its continued accuracy ...

Страница 2: ...t c o n d i t i o n a t a l l t i m e s a t l o w f i r e r a t e w h e n i d l i n g T u r n i n g t h e c o o k e r b u r n e r O F F i s N O T r e c o m m e n d e d u n l e s s s e r v i c i n g i s r e q u i r e d o r w h e n t h e c o o k e r i s l e f t u n a t t e n d e d f o r s e v e r a l d a y s Consumer Protection Act 1987 As responsible manufacturers we take to make sure that our prod...

Страница 3: ...ing the highest temperature see chart below NOTE NON BOILER MODELS MAY OPERATE AT HIGHER TEMPERATURES THAN THOSE QUOTED ABOVE To Heat the Top Main Oven and Increase Hotplate Temperature Turn the control knob C to the required setting which will take up to 90 minutes to attain from idling temperatures When the top main oven temperature is reached the required temperature will be maintained by lower...

Страница 4: ...astry quiche cases blind just place the flan dish on the oven floor for soggy free pastry When the oven is hot the floor of the oven can be used for shallow frying a cast iron dish is recommended with the added advantages that fat splashes are carbonsied so cleaning is minimised and frying smells are taken away through the flue For perfect baking results turn food during cooking The top of a hot o...

Страница 5: ...e cleaning with a soapy damp cloth Use a wire brush to keep the cast iron hotplate clean General cleaning is best carried out when the Rayburn is cool IMPORTANT Aga recommend Vitreous Enamel Association approved cleaners for cleaning the vitreous enamelled surfaces of this product But they are unsuitable for use on chrome and stainless steel components including the hand rails and their brackets T...

Страница 6: ...5 ...

Страница 7: ...6 ...

Страница 8: ...7 ...

Страница 9: ...olicy of continuous product improvement the Company reserves the right to change specifications and make modifications to the appliance described at any time Manufactured by Aga Station Road Ketley Telford Shropshire TF1 5AQ England www aga web co uk www agacookshop co uk www agalinks com ...

Страница 10: ...web co uk Consumer Protection Act 1987 As responsible manufacturers we take care to make sure that our products are designed and constructed to meet the required safety standards when properly installed and used IMPORTANT NOTICE PLEASE READ THE ACCOMPANYING WARRANTY Any alteration that is not approved by Aga could invalidate the approval of the appliance operation of the warranty and could also af...

Страница 11: ...nks to OFTEC Standard T100 The oil storage tank must be positioned with the bottom of the tank not less than 630mm and the top not more than 3 2m above the base of the cooker Oil Pipe Line The oil line from the storage tank to the appliance should be fitted with a remote acting fire valve such as Teddington KBB 66ºC located outside the building or where the supply enters the wall on the inside of ...

Страница 12: ...nate above the roof level in accordance with current Building Regulations and statutory requirements as outlined in BS 6461 Part 1 and BS 7566 Parts 1 to 4 However well designed constructed and positioned the satisfactory performance of a flue can be adversely affected by the down draught caused by adjacent tall buildings and trees or even nearby hills These deflect the wind creating a zone of hig...

Страница 13: ...6700 8 The use of horizontal pipe runs should be avoided wherever possible in order to prevent the collection of air in the system If horizontal runs are unavoided the pipes should rise upwards in the direction away from the appliance Hot Water Storage Vessel It is recommended that an indirect 140 litre 30 gallon hot water storage cylinder of the double feed type e g Manufactured by Albion Cylinde...

Страница 14: ...tem in accordance with standard practice 5 Coat the male thread of the oil burner pipe assembly elbow with oil resistant compound and screw into the burner base check position of elbow See Fig 6 Visually confirm that the oil burner pipe is level or slopes upwards to the oil entry in the burner base to avoid air locking 6 Fit oil burner base to support plate and secure with 3 bolts 7 Lift up insula...

Страница 15: ... cross spirit level to ensure burner is level in all directions NOTE THE BURNER BASE MUST BE LEVEL 4 Insert the copper oil feed pipe through the side of the cooker with the front end turned upward for connection to the burner base front elbow The opposite end of the pipe should be connected to the elbow on the outlet of the oil control valve NOTE KINKING OF THE OIL FEED PIPE MUST BE AVOIDED OTHERW...

Страница 16: ...epth adjust the oil control valve height via the adjusting screws between the valve and mounting bracket Re check the oil burner and valve are level in all directions General a Turn oil valve control knob to OFF disconnect the copper pipe connection at the burner base and withdraw Draw off the oil in the burner base Alternatively the oil can be sucked out using an aspirator b Fit the burner wicks ...

Страница 17: ...ood assembly See Fig 5 Sample the flue products through the hole for a Smoke Test utilising a Baccarach Smoke Pump where all reading should indicate a Smoke Number 0 1 under the following checks i At low fire rate ii At high fire rate WARNING NEVER ATTEMPT TO RELIGHT A HOT BURNER DO NOT TURN ON UNTIL THE BURNER IS COOL 1 Remove the oil control valve cover then depress the trip lever D on the front...

Страница 18: ... knob to a higher number setting to control the desired oven temperature No 1 position is the minimum and idling rate and setting up to No 6 will provide a maximum oven temperature of 270ÞC Before the temperature is attained turn the knob setting down to suit the oven load and temperature requirements When not in use set control knob to No 1 setting NOTE THE BURNER IS INTENDED TO RUN IN A CONTINUO...

Страница 19: ...layer of paper in combustion chamber base plate b Thoroughly brush boiler rear face and cooker LH side in an upward and downward direction Brush across the oven top c Remove layer of paper with fallen debris d Brush and clean in between hotplate ribs on underside e Examine soft rope seal located on underside of hotplate baffle plate and replace if worn or frayed f Examine soft rope seal located ar...

Страница 20: ...11 ...

Страница 21: ...policy of continuous product improvement the Company reserves the right to change specifications and make modifications to the appliance described at any time Manufactured by Aga Station Road Ketley Telford Shropshire TF1 5AQ England www aga web co uk www agacookshop co uk www agalinks com ...

Страница 22: ...00K 5 48 kW 208K 7 42 kW Fuel suitability Class C2 Kerosene suitable for vaporising burners Oil inlet 1 4 BSP Flue outlet 100mm Vertical Maximum flue gas temperature 330 deg C Combustion air supply requirement 31 cm2 e g 100mm diam or 9 X 3 plastic brick 208K only Boiler Heat Exchanger Cast iron VE lined Boiler connections 2 off 1 B S P Maximum boiler output 2 35 kw hr Average hot water output 400...

Страница 23: ... assembled from individual enamelled cast iron components which may cause the product to vary slightly in its overall dimensions Consequently any recess should be generously dimensioned with a minimum width of at least 1150mm ...

Страница 24: ...plate Oil Supply The installation of the oil storage tank and pipeline should only be carried out by a competent person A risk assessment will need to have been made of the proposed oil storage arrange ments Oil storage tanks may be of plastic or steel construction and ideally of 3000 litres capacity located on an approved design of base For actual guidance on tank installation please refer to OFT...

Страница 25: ...t be installed as shown with its body located outside of the property and the sensor located adjacent to the Rayburn A second fire valve should be fitted immediately before the OCV and with its sensor located within the Rayburn burner housing on the securing clips provided An oil filter must also be fitted prior to the OCV Typical Oil storage layout Oil Supply ...

Страница 26: ...f there is no masonry chimney available then a prefabricated twin wall factory insulated sys tem may be used of an appropriate material normally stainless steel Internal diameter should be 125mm Note that the appliance operates in a dry condition with a negative draught and has a maximum flue gas temperature of 330 deg C There must also be some provision for cleaning access An approved oil termina...

Страница 27: ...m is to be much preferred This then allows for a suitable corrosion inhibitor to be added 28mm diameter pipes should be used for the flow return pipework which should be arranged so as to allow for gravity circulation A maximum length of 5 metres each i e distance between the Rayburn and the storage cylinder will ensure the hot water performance is maintained No thermostat valves or other restrict...

Страница 28: ...cialist With Aga s policy of continuous product improvement the Company reserves the right to change specifications and make modifications to the product described at any time The Rayburn 200 series are manufactured by Aga Station Road Ketley Telford Shropshire TF1 5AQ www aga web co uk www agacookshop co uk www agalinks com Iss 3 Sep 2006 S T LPRT 513917 ...

Отзывы: