24
To access the boiler burner flueways:-
1.
Remove top LH door
(Rayburn 680KCD C/F only)
and facia glass. Remove 2 fixing screws from control
panel chassis and hinge open.
2.
Remove plug from sampling point. (See Fig. 22).
The controls of the boiler burner are factory pre-set,
however small adjustments may be necessary to suit the
site conditions.
Turn boiler burner on.
After 15 minutes remove the cover plug for the Boiler
Sampling Point (behind the controls door). Remove the
plugging screw and insert the sensing end of a portable
indicator to check the CO
2
(Carbon Dioxide) level. Adjust
the boiler burner air intake until a reading of 11-11.5%
CO
2
is recorded on the indicator.
Check Smoke
Remove CO
2
sampling tube for flue sampling insert the
sensing end of a Baccarach Smoke Pump and check that
the smoke in the boiler flueways do not exceed No. 2 on
the scale. Replace the plugging screw, and plug.
When satisfied with combustion check, refit burner door
inner panel.
Refit outer burner door
(Rayburn 680KCD C/F only)
.
Commissioning Instructions
SET COMBUSTION AIR - BOILER
Fig. 21
DESN 515969
DESN 515954
Fig. 22 - Rayburn 680KCD C/F shown
REMOVE BOLT TO
USE BOILER
SAMPLING POINT
Содержание 680KCD C
Страница 16: ...16 Site requirements Fig 6 680KCD C F 780KCD C F Rayburn 600 700 Wiring 111MB for independent Satronic boxes...
Страница 19: ...Installation requirements 19 Fig 12 ALL BAFFLES MUST BE STACKED IN PLACE AS DIAGRAM ABOVE DESN 515919...
Страница 32: ...31...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...