![Ravenheat CS 80 T Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/ravenheat/cs-80-t/cs-80-t_instructions-for-use-installation-and-servicing_789106063.webp)
63
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the
manu
I
acturers instructions and the data
¿
elds on the commissioning chec
N
list
completed in full.
7
o instigate the boiler guarantee the boiler needs to be registered with the
manufacturer within one month of the installation.
7
o maintain the boiler guarantee it is essential that the boiler is ser
Y
iced annually
by a
*
as
6
afe registered engineer who has been trained on the boiler installed.
7
he ser
Y
ice details should be recorded on the
%
enchmar
N 6
er
Y
ice Inter
Y
al
5
ecord and left with the householder.
Содержание CS 80 T
Страница 2: ...2 ...
Страница 21: ...21 4 10 FLUE TERMINAL POSITION ...
Страница 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 56 ...
Страница 55: ...55 11 SPARE PARTS Fig 57 ...
Страница 61: ...61 ...
Страница 62: ...62 ...
Страница 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Страница 65: ...65 12 1 ANALYSER CHECK LIST ...