2
Viper Do’s and Don’ts
1.
Do
have a flashdisk in the Viper at all times, including for
Power-on.
2.
Don’t
remove the flashdisk when the Viper 2 program is
running.
3.
Do
have the Viper serial number and firmware revision
available when calling for technical assistance. It is best
if the user is in the machine and in front of the Viper when
calling for tech support.
4.
Do
read the manual in its entirety before using Viper.
5.
Do
power the DGPS receiver and the Raven console or
CANBus system before powering Viper.
6.
Don’t
turn Viper off when in a job, without properly closing
the job first. If Viper loses power when in a job, job files
will not be saved and the associated files will be corrupt.
7.
Don’t
connect Viper to a switched source. Always connect
to a battery or other unswitched source.
Backlight Adjustment
Increase Intensity
1.
Hold the
Menu
button and press the
Up
arrow key.
Decrease Intensity
1.
Hold the
Menu
button and press the
Down
arrow key.