background image

3

4. Locate the factory power and ground wire cluster under the instrument panel. 

The factory wire cluster is spliced into power and ground wires which lead to the 
accessory port or cigarette lighter in the vehicle cabin.

5. Trace wires to help identify the power (red) and ground (white) wires used to 

power the Viper Pro field computer.

6. Using the supplied wire cutter/stripper (P/N 321-0000-393), cut the power and 

ground leads powering the field computer approximately 2 in [5 cm] from the 
factory splice.

Note:  

A crimp connector will be installed on the red (power) wire still connected to 

the factory splice later in this process.

7. Locate the knockout below the instrument panel and route the leads cut from 

the factory splice through an open port.

8. Crimp the supplied ring terminals (P/N 405-0200-053) onto each of the lead 

wires.

 CAUTION

Damage to electrical equipment or electrical 
shock may occur when cutting power and 
ground wires. Disconnect the vehicle battery, 
use insulated tools or wear rubber gloves as 
appropriate.

Factory 

Wire Splice

Knockout 

Location

Содержание Viper Pro

Страница 1: ...for Raven Viper Pro Field Update Guide...

Страница 2: ...dustries for update Contact a local Raven dealer for assistance Important Safety Information Read the following procedures carefully before installing the field update kit and follow all safety inform...

Страница 3: ...Pro to prevent damage to the field computer 3 Locate the instrument panel with the product pump and hydraulic shut off switch in the vehicle cabin Remove the 4 screws and carefully lift the instrument...

Страница 4: ...ring the field computer approximately 2 in 5 cm from the factory splice Note A crimp connector will be installed on the red power wire still connected to the factory splice later in this process 7 Loc...

Страница 5: ...st located in the right rear corner below the cabin 11 Open the panel on the front side of the console along the right side of the vehicle cabin 12 Locate the grey wire with the female 1 4 quick disco...

Страница 6: ...ed to take advantage of the automatic power down feature on the field computer Review the following procedure to complete the installation of the field update kit 1 Locate the round 16 pin cable conne...

Страница 7: ...onnector labeled CAN under the pump switch instrument panel The connector should be located near the factory power and ground cluster found earlier in the field update process 2 Disconnect the 4 pin c...

Страница 8: ...e disk contents 9 Double click on the ViperST10 Programmer exe icon to begin the update process The update may take approximately 15 seconds to begin When the update is in progress the Viper Pro will...

Страница 9: ...version 22 is shown If so the firmware update has been successful 16 Check the software version displayed on the screen a If the software version is 3 5 0 21 or newer no software update is necessary t...

Страница 10: ...web site 1 Insert the provided USB flash drive P N 063 0173 427 into the Viper Pro 2 Press the power button on the Viper Pro field computer 3 Touch the Display Program List button when the following...

Страница 11: ......

Страница 12: ...x Falls SD 57117 5107 Fax 605 331 0426 www ravenprecision com www ravenhelp com Notice This document and the information provided are the property of Raven Industries Inc and may only be used as autho...

Отзывы: