C
HAPTER
5
36
RBR Enterprise Vector 300 LS/Venturi LS RS1/HDU Installation Manual
FIGURE 19. 2-Pin Connector on the HDU Valve Cable
4. Route the HDU valve cable outside of the cab using the circular hole in the cab floor.
FIGURE 20. Feeding HDU Cable out of Cab
5. Route the HDU valve cable to the steering valve.
6. Plug the 3-pin connector into the pressure transducer and the 4-pin connector into the valve.
Содержание RS1/HDU
Страница 4: ...Table of Contents ii RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 8: ...CHAPTER 1 4 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 12: ...CHAPTER 2 8 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 13: ...2 Introduction Updates 9 INTRODUCTION...
Страница 14: ...CHAPTER 2 10 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 25: ...Hydraulic System Installation Hydraulic Diagram 21 HYDRAULIC SYSTEM INSTALLATION HYDRAULIC DIAGRAM...
Страница 26: ...CHAPTER 3 22 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 30: ...CHAPTER 4 26 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 45: ...Cab Component Installation System Diagrams 41 CAB COMPONENT INSTALLATION SYSTEM DIAGRAMS...
Страница 46: ...CHAPTER 5 42 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 51: ...APPENDIX A 44 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...
Страница 53: ...Index 46 RBR Enterprise Vector 300 LS Venturi LS RS1 HDU Installation Manual...