4
P/N 016-0171-655 Rev. D
17
NOZZLE CONTROL VALVE INSTALLATION
4. Thread the ProStop-E adapter (P/N 063-0173-964) to the Wilger nozzle body.
FIGURE 4. ProStop-E Adapter Installation Location
5. Attach the Wilger nozzle body to the boom.
6. Install the Hawkeye
®
NCV to the Wilger drop closest to the wet boom tube.
7. Using the U-clip, install the ProStop-E to the previously installed adapter. Ensure the flat surface on the U-clip is
towards the ProStop-E body (tabs down).
SPECIAL INSTALLATION INSTRUCTIONS
1. In the areas of the center rack and the first three nozzle bodies of the primary boom where the wet pipe is
offset behind the boom way inlet use the modified nozzle assembly. The assembly requires the Wilger nozzle
body 2-way inlet (P/N 333-0002-332), the Wilger adapter plug (P/N 333-0002-319), and Wilger end body (P/N
333-0002-325).
FIGURE 5. Completed Wilger Assembly
Содержание Hawkeye
Страница 18: ...CHAPTER 3 14 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 28: ...CHAPTER 4 24 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 34: ...CHAPTER 5 30 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 39: ...P N 016 0171 655 Rev D 35 CHASSIS CABLE INSTALLATION FIGURE 6 System Diagram Page 2 ...
Страница 40: ...CHAPTER 6 36 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 44: ...APPENDIX A 40 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 48: ...APPENDIX B 44 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...
Страница 52: ...Index 48 AGCO RoGator C Series RG900 RG1100 RG1300 Hawkeye Installation Manual ...