background image

1

Overview

The Envizio Pro console is an all-in-one field computer capable of providing 
product control for up to two products, supplying GPS information to other in-cab 
devices, and providing on-screen guidance during field applications. All of these 
features may be controlled at the same time with an easy to use touch screen.

In addition, the Envizio Pro is capable of working with the following:

• Raven AccuBoom™ automatic section control system

• Raven AutoBoom™ automatic boom height control systems

• Raven SmarTrax™ or SmartSteer™ automated steering control systems

• Raven TM-1 Tilt Module for tilt corrected guidance

Startup

To power up the Envizio Pro console, press the power button located on the right 
side of the Envizio Pro console.

Do’s and Don’ts

Do

 have the Envizio Pro serial number and firmware revision available when 

calling for technical assistance. It is best if the user is in the machine and in front 
of the Envizio Pro when calling for support.

Do

 read the manual in its entirety before using Envizio Pro.

Don’t

 

turn the Envizio Pro off without properly closing any open jobs. If the Envizio 

Pro loses power during a job, information within the job files may be lost and the 
associated files may become corrupt.

Don’t

 

use sharp objects or harsh chemicals on the Envizio Pro touch screen. 

These may damage the display.

USB Port

Содержание Envizio Pro

Страница 1: ...Quick Reference Guide Envizio Pro...

Страница 2: ...n TM 1 Tilt Module for tilt corrected guidance Startup To power up the Envizio Pro console press the power button located on the right side of the Envizio Pro console Do s and Don ts Do have the Enviz...

Страница 3: ...utdown icon on the Home screen Info icon in the upper right corner of the display to view the current software and firmware versions of the Envizio Pro console If the Envizio Pro is connected to a CAN...

Страница 4: ...e and Setup Wizard menus Quick Access Bar While working in the Tools Menu the Quick Access Bar remains at the top of the screen and allows access to the Setup Wizard System GPS Computer and Vehicle me...

Страница 5: ...the currently loaded profile highlighted in the list of profiles stored on the Envizio Pro To Create a New Profile Touch the icon and use the on screen keyboard to enter the desired profile name To Sa...

Страница 6: ...ole Touch the All button on to perform the selected action on all of the files displayed in the list For example select the Unload All to USB Drive to transfer all the jobs onto the connected USB flas...

Страница 7: ...Select the desired baud rate for the output messages from the list on the right side of the screen Start a Job 1 To begin a job touch the icon on the Home screen The Start Job Verify Settings screen w...

Страница 8: ...oom system will be used the system may be enabled by selecting the AutoBoom button See the AutoBoom section in this guide or the AutoBoom Calibration Operation manual for more information 9 When finis...

Страница 9: ...he selected product or touch in the rates area to access the In Job Product Configuration screen Additional display options may be activated on the In Job Product Configuration screen 11 Touch the Rat...

Страница 10: ...ctive To Load an A B Line Touch the Load A B Line icon to load a previously saved line into the current job This icon will not appear if an A B Line has already been set Reset the line to access the L...

Страница 11: ...con to move the guidance path to the left in the increments set on the Nudge Settings screen Recording a Field Boundary To Record a Field Boundary 1 Begin a job file by following the procedure outline...

Страница 12: ...creen to display the AccuBoom Override icon on the Guidance screen 2 The Turn Off Percent value sets the percentage of the boom section width that must be in a previously applied area or no spray zone...

Страница 13: ...Guidance screen will re appear and Envizio Pro will begin recording the boundary or feature On the Guidance screen a Pause and End icon appear for the feature currently being recorded The Guidance scr...

Страница 14: ...e procedure in the Start a Job section earlier in this guide and select the to begin guidance 4 Before guidance will begin the operator will be prompted to review the Glide Series AutoBoom system sett...

Страница 15: ...CANbus ends not terminated Make sure that both ends of the CANbus system are properly terminated Refer to the Envizio Pro Installation Operation manual for more information Corroded pins in CANbus con...

Страница 16: ...Industries Inc All rights reserved under copyright laws Raven Industries Toll Free U S and Canada 800 243 5435 Applied Technology Division or Outside the U S 1 605 575 0722 P O Box 5107 Fax 605 331 04...

Отзывы: