Raven CAN Switch Box Скачать руководство пользователя страница 8

6

2 - Marker Raise/Lower Function Switch. 

Toggle the marker function switch to 

raise or lower the implement markers as determined by the Marker Mode switch.

To utilize the automatic marker control mode during an active job:

1. Toggle the Marker Mode switch to the AUTO position.

2. Toggle the Marker Function switch to the down position to lower the first marker.

3. At the end of the swath, toggle the Function switch to the up position to raise the 

first marker.

4. When starting the next swath, toggle the Function switch to the down position to 

lower the second marker in sequence.

3 - Tool Bar Raise/Lower Switch. 

In plant or field mode, hold the Tool Bar switch 

in the up position for at least two seconds to automatically raise the implement to 
the field high limit position. Hold the Tool Bar switch in the down position for at 
least two seconds to automatically lower the implement for 10 seconds.

4 - Auxiliary (AUX) Controls Switch. 

Toggle the AUX switch on (I) or off (O) to 

engage the fan or vacuum system or a down pressure control system connected 
to the OmniRow system for seed handling and singulation.

5 - Lights Switch. 

The Lights switch may be connected to a work light system or 

provide auxiliary output for general purpose use.

6 - Section Switches. 

The 3-way selectable section switches may be used to 

toggle each section (up to four individual sections).

The section switches may be used to toggle up to ten individual sections. Raven 
field computers are also capable of controlling additional sections using the 
section mapping feature to group sections to the same switch. Refer to the field 
computer 

Installation and Operation Manual

 for additional information.

Note:  

Envizio Pro software version 3.5 or newer is required to access section 
mapping. Contact a local Raven dealer for additional information.

Each of the four section switches may be toggled individually to one of the three 
following positions:

• ON - manually control the section on. AccuBoom control of the section is 

disabled and will not automatically control this section based on coverage, zone 
maps or field boundaries.

• ACCU - AccuBoom automatic section control is enabled for the section. If 

installed and properly set up for the active job, the AccuBoom features will 
automatically turn sections on or off based upon previous coverage, zone maps 
or field boundaries created or active in the job.
Refer to the control console or field computer operation manual for more 
information about using the AccuBoom system.

• OFF - manually control the section off. This section will remain off regardless of 

AccuBoom control features.

Note:  

Leave the section switch in the off position for any sections not connected 
or controlled by the Raven control console or field computer.

Содержание CAN Switch Box

Страница 1: ...for use with OmniRow Systems CAN Switch Box Installation and Operation Guide ...

Страница 2: ...y modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availability and accuracy of wireless and satellite navigation and correction services e g GPS GNSS SBAS etc Therefore Raven Industries cannot guarantee the accuracy integrity continuity or availability of ...

Страница 3: ...se switch for quick application rate adjustments A Logic Power LED In addition to the above features the CAN Switch Box for use with OmniRow systems offers implement control switches which may be used to control several functions connected to the OmniRow control system Care and Maintenance Refer to the following items when selecting a mounting location for the CAN Switch Box and Raven control cons...

Страница 4: ...s we strive to make your experience with our products as rewarding as possible One way to improve this experience is to provide us with feedback on this manual Your feedback will help shape the future of our product documentation and the overall service we provide We appreciate the opportunity to see ourselves as our customers see us and are eager to gather ideas on how we have been helping or how...

Страница 5: ...r Pro Envizio Pro chassis interface cable P N 115 0171 926 To connect the CAN Switch Box 1 Connect the 4 pin Deutsch connector on the console or interface cable to the CANbus port on the back of the CAN Switch Box 2 Connect the 2 pin Deutsch connector on the console or interface cable to the switched power port on the back of the CAN Switch Box 3 If connecting to an Envizio Pro using the chassis i...

Страница 6: ...tes the status of CAN logic power into the CAN Switch Box This LED should be on solid during normal operation The Logic Power LED will begin flashing if low logic power is supplied to the CAN Switch Box Troubleshoot the logic power system before proceeding with operations If this LED is not lit when the Raven console or field computer is powered up troubleshoot the CANbus system before starting an...

Страница 7: ...ing transportation 4 Tool Bar Raise Lower Switch In transport mode the Tool Bar switch will only actuate the implement valves while the switch is held Hold the Tool Bar switch in the up position to raise the implement or in the down position to lower the implement Plant Mode Switch Functions 1 Marker Mode Switch Toggle the marker mode to select the left marker right marker or automatic marker cont...

Страница 8: ...table section switches may be used to toggle each section up to four individual sections The section switches may be used to toggle up to ten individual sections Raven field computers are also capable of controlling additional sections using the section mapping feature to group sections to the same switch Refer to the field computer Installation and Operation Manual for additional information Note...

Страница 9: ...manual control mode holding the INC DEC switch will open or close the product control valve increasing or decreasing the flow of product respectively Refer to the control console or field computer operation manual for instructions on programming products or switching a product to manual mode 8 Master Override Switch The master switch toggles all section switches on or off When the master switch is...

Страница 10: ...bus Check CANbus connector on CAN Switch Box Check CAN connections and cabling Check CAN terminator on end of CANbus line Check for 12 volts on switched power connector Console not set up for CANbus control Verify that the console or field computer product control configuration is set to CAN Boom valves do not turn on Faulty CAN high current power connection Verify high current HC power LED on pro...

Страница 11: ...ously unapplied area and maintain a speed of at least 0 7 mph 1 1 km h Enable the Override feature on the control console or field computer Section status does not turn green ON when sections enabled Master switch must be toggled off at power up Cycle the master switch off then back on Sections not properly configured Verify section setup on the control console or field computer Nodes not programm...

Страница 12: ... valve type Incorrect valve setting Check valve or PWM settings Sectionswitches toggled on in zero rate zones Toggle the section switches to the ACCU or OFF positions Sections enabled but field computer not recording coverage Remote section switches left in the ON position Toggle all remote section switches to the off position Remote switches will override the section switch status and automatic s...

Страница 13: ...are some common causes for communication failures Issue Possible Cause Solution Console or CANbus cannot find nodes Switch Box is not properly connected Check switched power connection Check the CANbus connection to the Switch Box and reinitialize the console to detect the Switch Box nodes Ensure console is powered on No power to Switch Box Check chassis cable power and ground connections Weak or ...

Страница 14: ... Industries Do Bring the defective part and proof of purchase to your Raven dealer If the dealer approves with the warranty claim the dealer will process the claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of ...

Страница 15: ...ociated equipment or products and will not be liable for loss of profit labor or other damages Cables hoses software enhancements and remanufactured items are not covered by this Extended Warranty The obligation of this warranty is in lieu of all other warranties expressed or implied and no person or organization is authorized to assume any liability for Raven Industries Damages caused by normal w...

Страница 16: ...d under copyright laws Raven Industries Applied Technology Division Toll Free U S and Canada 800 243 5435 P O Box 5107 or Outside the U S 1 605 575 0722 Sioux Falls SD 57117 5107 Fax 605 331 0426 www ravenprecision com www ravenhelp com Raven Industries Inc 2013 CAN Switch Box for use with OmniRow Systems Installation Operation Guide P N 016 0171 545 Rev A 2 13 E21066 ...

Отзывы: