3
Manual No. 016-0171-496 Rev. C
15
Standard AccuFlow™ Installation
Mounting the AccuFlow™ System
Use the provided u-bolts and hardware (P/N 107-0159-447) to mount the AccuFlow system directly to the
frame of the tool bar or implement. The intake port of the AccuFlow super cooler should be pointing toward the
rear of implement and nurse tank.
FIGURE 4.
AccuFlow™ Mounting Example
AccuFlow Intake Port
Содержание AccuFlow
Страница 1: ...AccuFlow HP Patent Pending AccuFlow and AccuFlow HP Installation Operation Manual ...
Страница 14: ...Chapter 2 10 AccuFlow and AccuFlow HP Installation Operation Manual ...
Страница 28: ...Chapter 3 24 AccuFlow and AccuFlow HP Installation Operation Manual ...
Страница 34: ...Chapter 4 30 AccuFlow and AccuFlow HP Installation Operation Manual FIGURE 2 Pressure vs Temperature Chart ...
Страница 68: ...Chapter 8 64 AccuFlow and AccuFlow HP Installation Operation Manual ...
Страница 86: ...Index 82 AccuFlow and AccuFlow HP Installation Operation Manual ...
Страница 89: ......