
Use and maintenance manual
RBV 8008 - RBV 8010
Pag.40
Rev.1 18/05/2021
MAINTENANCE
Safety warnings for maintenance
Maintenance of the stove must be performed at least once a year and should be planned in advance with the
Technical Assistance Service.
In some conditions, such as turning the stove on and off or inappropriate use, the combustion products can
contain small soot particles that build up in the smoke evacuation system. This can reduce the cross-section of
the smoke duct and pose a fire risk.
The smoke evacuation system must be inspected and cleaned at least once a year.
The maintenance operations must be carried out when the stove is cold and with the electrical power supply
disconnected.
Before completing any maintenance operation, adopt the following precautions:
•
Make sure that all stove parts are cold.
•
Make sure that the ashes are completely cold.
•
Always operate with equipment that is appropriate for maintenance.
•
When maintenance is finished, re-install all of the dis-assembled parts before restarting operation.
! IMPORTANT
The quality of the pellet, the stove operating mode and combustion control can affect
maintenance activity frequency.
Cleaning
! IMPORTANT
Perform the cleaning operations so as to guarantee correct stove operation. The table
below lists the necessary cleaning operations required for correct stove operation.
Glass cleaning
With a cold stove, clean the glass with a cloth and glass cleaner.
Note: there are stove glass cleaning products available on the market.
Combustion chamber cleaning
To clean the ash drawer, proceed as follows:
step
action
1
The stove requires a simple yet frequent cleaning in order to guarantee suitable yield and regular operation. Vacuum the
combustion
chamber every day using a bin ash vacuum, making sure that the ashes are completely cold.
PARTS / FREQUENCY
1 DAY
2-3 DAYS
60-90 DAYS
Combustion chamber
•
Combustion grille
•
Ash drawer
•
Glass
•
Extraction duct
•
Combustion chamber
A
A
B
B
C
C
D
D
E
E
F
F
4
4
3
3
2
2
1
1
DISEG.
VERIF.
APPR.
FABB.
Qual.
SE NON SPECIFICATO:
QUOTE IN MILLIMETRI
FINITURA SUPERFICIE:
TOLLERANZE:
LINEARE:
ANGOLARE:
FINITURA:
INTERRUZIONE
BORDI NETTI
NOME
FIRMA
DATA
MATERIALE:
NON SCALARE DISEGNO
REVISIONE
TITOLO:
N. DISEGNO
SCALA:1:20
FOGLIO 1 DI 1
A4
PESO:
50013DR00
Содержание RBV 8008
Страница 2: ...RBV 8008 RBV 8010 MANUALE D USO E MANUTENZIONE...
Страница 3: ......
Страница 7: ...RBV 8010 RBV 8008 RBV 8010...
Страница 9: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 50: ...RBV 8008 RBV 8010 MANUEL D UTILISATION ET D ENTRETIEN...
Страница 51: ......
Страница 55: ...RBV 8010 RBV 8008 RBV 8010...
Страница 56: ......
Страница 57: ......
Страница 95: ......
Страница 96: ......
Страница 98: ...RBV 8008 RBV 8010 USE AND MAINTENANCE MANUAL...
Страница 99: ......
Страница 103: ...RBV 8010 RBV 8008 RBV 8010...
Страница 104: ......
Страница 105: ......
Страница 143: ......
Страница 144: ......
Страница 146: ...RBV 8008 RBV 8010 BEDIENUNGS UND WARTUNGSHANDBUCH...
Страница 147: ......
Страница 151: ...RBV 8010 RBV 8008 RBV 8010...
Страница 152: ......
Страница 153: ......
Страница 191: ......
Страница 192: ......
Страница 194: ...RBV 8008 RBV 8010 MANUAL DE USO Y MANTENIMIENTO...
Страница 195: ......
Страница 199: ...RBV 8010 RBV 8008 RBV 8010...
Страница 200: ......
Страница 201: ......
Страница 238: ......
Страница 239: ......
Страница 240: ......
Страница 242: ...HANDLEIDING VOOR GEBRUIK EN ONDERHOUD RBV 8008 RBV 8010...
Страница 243: ......
Страница 249: ......
Страница 290: ......
Страница 291: ......
Страница 292: ......