Use and maintenance manual
Dual 9 super
Rev.1 26/03/2018
EN
Pag.48
Main parts
element
A
Grid for air passage
B
Combustion chamber
door
C
Ashes drawer
D
Pellet cover
E
Inspection hatch
F
Combustion chamber
G
Slide for ashes
SHIPPING AND INSTALLATION
Safety warnings for transportation and installation
! IMPORTANT
The stove must be installed by a qualified technician, who must issue a declaration of
conformity of the system to the purchaser, taking full responsibility for stove installation
and correct operation.
! IMPORTANT
The stove installation site must be chosen so that the generated heat can spread evenly
throughout the rooms that you wish to heat.
The stove needs to be connected to a single chimney that guarantees the draught declared by the Manufacturer
and observes the installation regulations that apply to the installation site.
The room where the stove is installed must have an air intake.
The air vent must be installed in such a way that it can not be blocked.
The Manufacturer will not be held liable for installation that is not compliant with the laws in force, incorrect air circulation in the rooms
and inappropriate use of the appliance.
In particular, it is necessary:
•
that the appliance be connected to a smoke evacuation system duly sized to guarantee the draught declared by the Manufacturer,
that is tight and observes the distances from flammable materials;
•
that there is a suitable combustion air intake in compliance with the type of installed product;
•
that other installed combustion appliances or devices do not create a vacuum in the room where the stove is installed;
•
that the safety distances from flammable materials are observed.
Verification of system compatibility has a priority over any other assembly or installation operation.
A
D
B
C
E
F
G