
9.2 GAS KIT installation
This chapter describes the procedures that need to be carried out in order to install the GAS
KIT.
When installing the kit remember that:
RED
always indicates High Pressure (
HP
) couplers
BLUE
always indicates Low Pressure (
LP
) couplers
Carry out the following operations with the equipment
switched off and disconnected from the power mains.
Proceed as follows:
1. Locate the service hoses.
2. Make sure there are the specific O-rings at the base of the threaded connections.
3. Firmly tighten the quick couplers onto the threaded connections being suer to follow the
colour indication:
•
red coupler (HP) - red hose (HP)
•
blue coupler (LP) - blue hose (LP)
| YUCON | 26 | en
| 2024-03-01
Ravaglioli
Содержание YUCON T700
Страница 1: ...Rev Rev YUCON 01...
Страница 2: ...SUMMARY ENGLISH 5 1 YUCON...
Страница 3: ...YUCON 2 en 2024 03 01 Ravaglioli...
Страница 48: ...Data plate PS maximum operating pressure TS operating temperature en 47 YUCON Ravaglioli 2024 03 01...
Страница 49: ...19 HYDRAULIC DIAGRAM YUCON 48 en 2024 03 01 Ravaglioli...