Instruction manual
RAVAGLIOLI S.p.A.
RAVTD1760 WS – RAVTD1780 WS
Code M0197 - rev.1.0
(11/2010)
RAVAGLIOLI S.p.A. -
Via I° Maggio, n° 3 (Pontecchio Marconi)
Page 23/52
40037 Sasso Marconi (Bologna - Italy)
Tel. 051/ 67.81.511 – Fax 051/ 84.64.67 E-mail: [email protected]
8.4 Preliminary Operations
8.4.1 Vehicle Check Preliminary Operations
Before starting the check of vehicle geometrical alignment, the following checks shall be
carried out:
•
Check and, if necessary, eliminate any clearance
on
suspensions
and
on
steering
linkage
•
Check and, if necessary, eliminate any hard spot or yielding of suspension spring parts.
•
Adjust tyre pressure to the values specified by the manufacturer.
•
Position and distribute any load envisaged by the manufacturer.
8.4.2 Run-Out
Preparation
After having displayed vehicle technical specification page (see par. 8.3 on page 22), you can
prepare vehicle for Run-Out procedure. Proceed as follows:
-
Fit clamps and detectors onto wheels
-
Raise vehicle from lift platforms (if an Run-Out with raised wheel is carried out, see par.
8.5.1)
-
Lock rotating plates
Figure 26
DETECTOR
KEYPAD
PC KEYBOARD
DESCRIPTION
It goes back to previous page
Raised wheel Run-Out selection
(par. 8.5.1 on page 24)
or thrust Run-Out
(par. 8.5.2 on page 27)
It continues to next page
(Run-Out)
(par. 8.5 on page 24)
Note: during this phase, the images showing the 4 sensor batteries with the residual charge
% are displayed.
front sensor
battery charge %
rear sensor
battery charge %