Service manual
AXIS-H EMC/AXIS-H EMC+W
Initialisation of the drop point actuators
Rauch Landmaschinenfabrik GmbH
+49 (0)7221/985-250 [email protected]
Page
1
of
3
AGP-Init_de
29/08/2014
Chapter 430
The initialisation is required:
- Drop point actuator replacement
- Implement ECU replacement
- Software update
An initialisation is the “initial meeting” of the implement ECU and the actuator
1. Preparation:
Open the cover of the cable duct:
AXIS H 50.1
1 cable duct
AXIS H 30.1
2 cable ducts
The connector plugs of the drop point actuators are located in the cable duct
(the drop point actuators are equipped with white cables). The designation of the
connectors can be found on the machine cable.
Depending on the cable type, the cable designation is stamped in or labelled by
means of yellow cable tags.
Drop point, left-hand side
AL
Drop point, right-hand side
AR
AXIS H 50.1
AXIS H 30.1