
Installation
|
17
+44 (0) 1527 396900 / [email protected] / www.ratioev.uk
4.
Check on which phase of the main power grid the power outlet is connected.
5.
Place a current transformer around the same phase wire of the main power grid, between
the main fuse and the consumer unit.
6.
Insert the 3.5mm jack of the current transformer to the L1 input on the Sensor Box.
17
www.ratio-electric.com
1
(L)
(N)
MAINS
2
3
1
(L)
(N)
MAINS
2
3
(N)
1
(L)
(N)
MAINS
2
3
(N)
4 . Check on which phase of the main power grid the power outlet is connected.
5 . Place a current transformer around the same phase wire of the main power grid, between
the main fuse and the consumer unit.
6 . Insert the 3,5 mm jack of the current transformer to the L1 input on the Sensorbox.
Note : For correct functioning of the Sensorbox, you must install this current transformer
around the same phase as the power supply (L).
Note: Make sure the arrow on the current transformer points towards the entry point of
the main power grid. See the image below for more information on the correct mounting
location of the CT clamps.
CT
Clamp
Sensor
Box
Solar
Panels
1
2
3
Data to
Charging Station
Distribution
box
Main
Fuse
Net
L1
L2
L3
N
L1 L2 L3
TVS
K
K
L
L
K
L
N
User
User
User
User
Note:
For correct functioning of the Sensor Box, you must install this current transformer
around the same phase as the power supply (L).
Note:
Make sure the arrow on the current transformer points towards the entry point of
the main power grid. See the image below for more information on the correct mounting
location of the CT clamps.
Note:
For single-phase installations only install CT clamp 1 and connect to L1 position on
Sensor Box.
17
www.ratio-electric.com
1
(L)
(N)
MAINS
2
3
1
(L)
(N)
MAINS
2
3
(N)
1
(L)
(N)
MAINS
2
3
(N)
4 . Check on which phase of the main power grid the power outlet is connected.
5 . Place a current transformer around the same phase wire of the main power grid, between
the main fuse and the consumer unit.
6 . Insert the 3,5 mm jack of the current transformer to the L1 input on the Sensorbox.
Note : For correct functioning of the Sensorbox, you must install this current transformer
around the same phase as the power supply (L).
Note: Make sure the arrow on the current transformer points towards the entry point of
the main power grid. See the image below for more information on the correct mounting
location of the CT clamps.
CT
Clamp
Sensor
Box
Solar
Panels
1
2
3
Data to
Charging Station
Distribution
box
Main
Fuse
Net
L1
L2
L3
N
L1 L2 L3
TVS
K
K
L
L
K
L
N
User
User
User
User
Содержание io5
Страница 1: ...1 44 0 1527 396900 info ratioev uk www ratioev uk io5 Installation Guide...
Страница 43: ...Service 43 44 0 1527 396900 info ratioev uk www ratioev uk 15 EC Declaration of Conformity...
Страница 44: ...Service 44 44 0 1527 396900 info ratioev uk www ratioev uk...
Страница 45: ...Service 45 44 0 1527 396900 info ratioev uk www ratioev uk Notes...