background image

Page 5

Battery Installation

1.

 Remove Access Panel 2 (see Figure 1).

2.

 Install battery shelf in Tower. The sides of the shelf align with 

    slots in the bottom of the Tower. 

3.

 Install battery on shelf in Tower. Mount so that the power cable 

    connection is on top of the battery.

4.

 Connect the power cables to the battery, 

red to positive and 

    black to negative.

Note:

 

Batteries that will not be installed within 90 days should be 

connected to RATH® Charger #RP7700100AV.  Failure to do this 

may result in the battery not working correctly upon installation 

or shortening of the battery life.

Power Cable 

Connection

90 Ah Battery

• 1/4” spanner adapter (provided to remove 

   Access Panel 1)

• Adjustable wrench

• Analog phone line (if using 900 MHz or a Landline)

• Phone cable (if using 900 MHz or a Landline)

5.

 Mount solar panel to solar panel bracket. Use the four sets of hardware provided (bolt/lock, nut/washer).

6.

 

IMPORTANT:

 Tighten all screws on the solar panel mounting bracket and solar panel once panel has 

    been attached to the bracket. 

7.

 Solar panel position is preset to winter months due to lower amounts of sunlight. We recommend you 

    keep it at the factory preset angle.

Secure solar panel bracket to solar 

panel in four locations with provided 

hardware (two per side).

8.

 Open up the black electrical box on back of solar panel by removing the screws. Open up the “knock out” 

    that will be facing the ground. Connect the power cable leading out of the solar tube through the “knock 

    out” and attach to the terminals in the electrical box. Connect 

red to positive and black to negative 

    which are the outer two terminals. Secure the weather tight connection to the box and reattach cover by 

    installing the screws.

9.

 Using a voltmeter, measure across the positive and negative contacts to confirm the panel is generating 

    approximately 20 volts on a sunny day.

10.

 Align the Tower mounting holes with the 3/4” galvanized rods and lift on to the concrete slab. Put a lock 

      washer on each along with a nut and secure tightly.

RED

 wire to 

POSITIVE

BLACK

 wire to 

NEGATIVE

Содержание 2100-TSL

Страница 1: ...RP8500080 Ver 4 10 17 36 Emergency Call Station Installation Operations Manual Emergency Tower Phone 2100 TSL Landline Solar Tower 2100 TSC Cellular Solar Tower 2100 TS9 900 MHz Solar Tower 2100 TST 2...

Страница 2: ...t with site preparation installation and maintenance It is our sincere hope that your experience with us has and will continue to surpass your expectations Thank you for your business The RATH Team N5...

Страница 3: ...rage Be careful of finished surfaces during transport and installation to avoid damaging the finish Installation and maintenance should only be performed by qualified electricians It is recommended th...

Страница 4: ...crete pad protecting the Tower surface 2 Assemble solar strobe tube to the top of the Tower using the four bolts flat washers and lock washers The mounting hardware is in a bag attached to the solar t...

Страница 5: ...to the bracket 7 Solar panel position is preset to winter months due to lower amounts of sunlight We recommend you keep it at the factory preset angle Secure solar panel bracket to solar panel in four...

Страница 6: ...n Saver in the NEMA 4 enclosure see drawing below 4 Using a voltmeter check each set of terminals for Solar Battery and Load The voltage should measure between 12 6 and 13 8 volts on each set If volta...

Страница 7: ...ers using 2 Way Radio are not ADA compliant the button must be pushed and held to talk and let go to listen Note Phones using 2 Way Radios are not programmable Sections in this manual on Programming t...

Страница 8: ...Press 8 Enter 3 digit number in minutes Ex 2 minutes 002 Step 5 To Exit Program Mode A Press Stop for 3 seconds Step 1 To Begin Program Mode A Call into phone by dialing the number of the Tower B Afte...

Страница 9: ...one below When the party you called hangs up does the strobe stop If you have answered YES to all questions you have successfully installed and tested the phone If you answer NO to any question procee...

Страница 10: ...the solar terminals Using a voltmeter measure the voltage across the two terminals It should read approximately 20 volts dc on a sunny day If voltage is low or 0 the panel may be damaged Disconnect th...

Страница 11: ...Page 11 Wiring Optional...

Отзывы: