Page 5
Battery Installation
1.
Remove Access Panel 2 (see Figure 1).
2.
Install battery shelf in Tower. The sides of the shelf align with
slots in the bottom of the Tower.
3.
Install battery on shelf in Tower. Mount so that the power cable
connection is on top of the battery.
4.
Connect the power cables to the battery,
red to positive and
black to negative.
Note:
Batteries that will not be installed within 90 days should be
connected to RATH® Charger #RP7700100AV. Failure to do this
may result in the battery not working correctly upon installation
or shortening of the battery life.
Power Cable
Connection
90 Ah Battery
• 1/4” spanner adapter (provided to remove
Access Panel 1)
• Adjustable wrench
• Analog phone line (if using 900 MHz or a Landline)
• Phone cable (if using 900 MHz or a Landline)
5.
Mount solar panel to solar panel bracket. Use the four sets of hardware provided (bolt/lock, nut/washer).
6.
IMPORTANT:
Tighten all screws on the solar panel mounting bracket and solar panel once panel has
been attached to the bracket.
7.
Solar panel position is preset to winter months due to lower amounts of sunlight. We recommend you
keep it at the factory preset angle.
Secure solar panel bracket to solar
panel in four locations with provided
hardware (two per side).
8.
Open up the black electrical box on back of solar panel by removing the screws. Open up the “knock out”
that will be facing the ground. Connect the power cable leading out of the solar tube through the “knock
out” and attach to the terminals in the electrical box. Connect
red to positive and black to negative
which are the outer two terminals. Secure the weather tight connection to the box and reattach cover by
installing the screws.
9.
Using a voltmeter, measure across the positive and negative contacts to confirm the panel is generating
approximately 20 volts on a sunny day.
10.
Align the Tower mounting holes with the 3/4” galvanized rods and lift on to the concrete slab. Put a lock
washer on each along with a nut and secure tightly.
RED
wire to
POSITIVE
BLACK
wire to
NEGATIVE