Items Needed for Installation
Page 4
• Concrete for 16” deep, 2’ diameter slab
• RATH® Kit 7476* or 7477**
• #1 Phillips screwdriver
• 1/4” driver
• Torx bit (provided to remove Access Panels)
*7476 (For New Concrete)
• (4) 3/4” x 12” galvanized anchor bolts
• (12) 3/4” flat washers
• (4) 3/4” hex nuts
• (4) 3/4” SAE washers
• (4) split lock washers
**7477 (For Existing Concrete)
• (4) anchors
• (4) 3/4” x 4” galvanized anchor bolts
• (1) setting tool
• (8) 3/4” flat washers
• (4) split lock washers
• 1/4” spanner adapter (provided to remove
Access Panel 1)
• Adjustable wrench
• Analog phone line (if using 900 MHz or a Landline)
• Phone cable (if using 900 MHz or a Landline)
Tower and Solar Panel Installation
1.
Lay Tower on one side with the base of the Tower next to the concrete pad, protecting the Tower surface.
2.
Assemble solar/strobe tube to the top of the Tower using the four bolts, flat washers, and lock washers.
The mounting hardware is in a bag attached to the solar tube.
3.
The solar panel bracket comes with all hardware tightened to prevent any disconnections in transit.
Loosen (do not remove) all hardware connections EXCEPT the four connections on the inner bracket
as shown below. These four connections are the factory preset solar panel angle.
4.
Mount solar panel bracket to solar/strobe tube. Make sure bracket will be facing south once secured
to the tube. Use the three provided hose clamps.
DO NOT
LOOSEN
DO NOT
LOOSEN
Secure solar bracket to solar/strobe
tube with the three provided hose
clamps. The two bracket surfaces
contacting the strobe tube must be
flush once secured. Solar panel is very
heavy so be sure they are tightened
down prior to installation.
Содержание 2100-TSL
Страница 11: ...Page 11 Wiring Optional...