background image

4

WINTERIZING

Tablet Dispenser

1. Close flow metering clamp and disconnect power

to water solenoid, if used, to prevent intake wa-
ter from entering tablet dispenser.

2.  Flush toilet and activate treatment cycle several

times to leave just water in tank.

3. Carefully remove small tube from white “T”

fitting or check valve from water solenoid valve.
Drain tube into a clean plastic container.

4. Carefully remove the small tube at the bottom of

the black “T” fitting. Drain tube into a clean plas-
tic container.

5. Connect Tube removed in step 3 to black “T”

fitting

6a. White “T’ fitting:

Connect tube removed in step 4 to white “T”

6b. Water Solenoid Valve

•

plug tube removed in step 4

•

shut off water to valve

•

drain water from valve, hoses and strainer

7. Take solution collected in plastic container and

pour into toilet bowl. Rinse container and dis-
pose of properly.

8. Flush toilet several more times to dilute solution

and clear it from system.

Treatment Unit
WARNING:  DO NOT

 use anti-freeze of any kind

to winterize the Purasan system.
1. Turn off power and disconnect wires to Purasan
2. Close seacocks.
3. Slowly open crossover plug

Caution:

 Open plug slowly if treatment tank is at

the lowest point water will spill out
4. Using a pump, remove water from both sides of

the treatment tank through crossover cap.

5. Disconnect and drain hoses.

Winterizing the Toilet

 - Follow the instructions in

the Owner’s Manual for that particular toilet.
IMPORTANT:  If toilet requires anti-freeze or other
chemicals for winterizing, DO NOT allow these
chemicals to enter the Purasan system.

plug tube

removed in

step 4

step 6a

step 6b

step 1

step 3

step 4

step 5

crossover plug

Close

Remove

and drain

Remove

and drain

Connect

tube

removed

in step 3

Connect tube

removed in step 4

Содержание PST*02

Страница 1: ...product Equipment damage injury to personnel or death could result from improper installation Raritan Engineering Company Inc accepts no responsibility or liability for damage to equipment or injury o...

Страница 2: ...ns 5 7 liters per cycle After Toilet is flushed Water is diverted to the tablet dispenser and must rise to the water level line dotted line but no higher The Purasan should not be activated again unti...

Страница 3: ...135 CAUTION Tablet dispenser may be under pres sure Open lid SLOWLY Remove used tablet cartridge 1 With adequate ventilation available Unscrew tablet dispenser lid and lift out used tablet car tridge...

Страница 4: ...container and pour into toilet bowl Rinse container and dis pose of properly 8 Flush toilet several more times to dilute solution and clear it from system Treatment Unit WARNING DO NOT use anti freez...

Страница 5: ...is working properly before proceeding These instructions are the reverse operation outlined in winterizing the Tablet Dispenser steps 3 through 6 1 Remove tube from the bottom of the black T fitting a...

Страница 6: ...e s u f r e k a e r B s p m a e z i s w a r d p m A l a n i m o n e g a t l o v 0 1 t e e f 5 1 t e e f 0 2 t e e f 5 2 t e e f 0 3 t e e f 0 4 t e e f 0 5 t e e f C D V 2 1 0 2 0 1 G W A 2 1 G W A 2...

Страница 7: ...Unit 4 Attach wires per wiring section to back of switch panel 5 Mount panel using 4 screws Apply a bead of nonpermanent sealant around rear edges of panel if located in shower area Purasan Tablet Dis...

Страница 8: ...ct 1 Connect discharge of toilet to one intake port 2 Insert plug or second toilet discharge into other intake port 3 Determine position and glue discharge elbow to top of tank using PVC cement 4 Conn...

Страница 9: ...led between source and Purasan on positive wire Switch Panel 1 Connect cable from Switch Panel to Circuit Board as follows S1 to S1 red wire S2 to S2 orange wire L1 to L1 green wire L2 to L2 white wir...

Страница 10: ...ntrol Board voiding warranty 2 Run 16 ga wire from small relay terminal to S2 on Circuit board and one post of the PBS push button switch Freshwater dual installation and manual toilets Solenoid valve...

Страница 11: ...lenoid for proper operation Intake tubing clogged clean or replace intake tubing Bowl Elbow was not changed install bowl elbow with restrictor supplied Overflow or water level too high in dispenser Me...

Страница 12: ...12 EXPLODED PARTS 10 17 18 8 7 21 63 64 56 43 45 6 42 43 47 49 32 31 29 28 53 23 55 50 23 23 24 22 41 100...

Страница 13: ...r Hold down Bolt 10 32x1 S S 4 9 31 109 Mixer Impeller 10 31 110 1 Impeller Bolt 12 24 x 5 8 S S 2 11 31 110 2 Impeller Lock Washer 12 S S 2 12 31 114 Cover Hold down Nut 10 32 18 13 31 115 Treatment...

Страница 14: ...tarts treatment cycle Flushing toilet will activate treatment cycle Note Toilet may be flushed as often as necessary do not exceed recommended flush volume 1 Mount Switch Panel near toilet CAUTION Use...

Страница 15: ...traffic subject to this regulation marine sanitation devices certified by the U S Coast Guard installed on all vessels shall be designed and operated to prevent the overboard discharge of sewage trea...

Страница 16: ...ls or workmanship supplied by others in the process of installation of this product defects caused by installation of this product other than in accordance with the manufacturer s recommended installa...

Отзывы: