Operating instructions D30+
│
P30+
│
SheraPrint 30
19
│
44
Rapid Shape GmbH
│
DOCR000231
4.2.2
Setting up the machine
For setting up the machine please proceed as follows:
1.
Prerequisite: The machine has already been unpacked.
→
Chapter 3.3
2.
Lift the machine to the desired installation location with the help
of a second person and put it down.
3.
Remove the protective film from the machine.
4.
Make sure that the four feet of the machine are completely
resting on the ground. The four rubber pads must all be present.
4.3
Connecting
For connecting the machine please proceed as follows:
1.
Prerequisite: The machine has already been set up.
→
Chapter 4.2.2
2.
Connect the mains cable to the power connector (back of the
machine).
3.
Connect the opposite end of the mains cable to the nearest,
properly grounded outlet. Be careful not to trip over cables lying
around.
4.
Recommended: Connect the network cable to the Ethernet port
on your machine (back of the machine) and to your network
interface.