- 11 -
3.1 Initial Setup Notes
Tower Installation
Ensure all six screws are properly installed and secured to the bottom of the tower.
Control Wires & Connections
Be sure the control wiring cables to the carriage unit are securely attached. Also be sure to verify the
battery connector is properly connected and within the cabinet cover.
Steering Arm & Sensing Arm Wheel
Verify the position of the steering arm tension spring and that it moves smoothly while turning the
control arm.
Содержание Eagle R2B2
Страница 8: ...8...
Страница 18: ...18...
Страница 21: ...21 4 2 Electrical Diagrams...
Страница 22: ...22 4 2 Electrical Diagrams...
Страница 25: ...25 4 4 Electrical Schematics...
Страница 26: ...26 4 4 Electrical Schematics...
Страница 27: ...27 4 4 Electrical Schematics...
Страница 28: ...28 4 4 Electrical Schematics...
Страница 29: ...29 4 4 Electrical Schematics...
Страница 30: ...30 4 4 Electrical Schematics...
Страница 31: ...31 4 4 Electrical Schematics...
Страница 32: ...32 4 4 Electrical Schematics...
Страница 33: ...33 4 4 Electrical Schematics...
Страница 34: ...34 4 4 Electrical Schematics...
Страница 40: ...40 6 1 Parts List Control Level Unit...
Страница 42: ...42 6 2 Parts List Body 6 2 Parts List...
Страница 45: ...45 6 3 Parts List Mast...
Страница 47: ...47 6 4 Parts List Film Carriage...