![Rans S-20 RAVEN Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/rans/s-20-raven/s-20-raven_text-manual_3669201072.webp)
RANS S-20 RAVEN
TEXT
MANUAL
09/01/2013
01I-01
AFT BAGGAGE COMPARTMENT
ASSEMBLY
(BEFORE COVERING AND PAINTING OF FUSELAGE)
1.
Tape all sheet metal parts of the Aft Baggage compartment together.
Refer to parts page drawing for proper orientation in relationship to the
flanges.
HINT: When assembled, flanges will NOT be visible from the
inside of the Aft Baggage Compartment.
2.
Transfer drill #30 the 3 lower aft corner pre-located holes on each side
and cleco.
NOTE: 1 hole per part per corner will be transfer drilled and
clecoed
.
3.
Slide taped assembly into place. The Back will rest against the tabs
welded to Station 4. The forward end of the Bottom will be on top of the
tabs at Station 3.
4.
Adjust the assembly up or down at each side until the Sides lap about half
way onto the fuselage tube. Tape in place.
5.
Press the forward end of the Sides against the small tabs On Station 3
and tape in place. Adjust as needed.
6.
Make sure the assembly is tight against all tabs. Transfer drill #30 through
small tabs and flanges. Cleco as you drill. The large tabs at the forward
edge will require transfer drilling #11 through the 3/16" hole.
7.
Cut Support Angles to length. Refer to
FIGURE 01I-07
and
FIGURE 01I-07A
. Trim ends to clear fuselage tubes, Mark Support Angles
for hole placement. Orientate, drill #30 and cleco.
8.
Rivet all flanged areas together. Do
NOT
rivet to tabs at this time.
9.
Rivet Support Angles to Baggage Compartment sheet metal. Do
NOT
rivet
to tabs at this time.