RANS S-20 RAVEN
TEXT MANUAL
09/01/2013
03H-01
ROTAX 912ULS - CHOKE CONTROL ASSEMBLY
(FINAL INSTALL OF ENGINE)
ASSEMBLY
•
The engine needs to be installed to the airframe.
•
Instrument Sub-panel must be installed
1.
Refer to the parts catalog and select the required components for
assembly. Refer to Manufacturer's instructions.
2.
Remove lock washer and retaining nut from Throttle Cable Assembly.
3.
Route Cables through right side hole in Instrument Sub-panel. Secure with
lock washer and retaining nut.
4.
Install Rubber Grommets to upper set of 5/16" holes below Regulator
Rectifier on Firewall and route cables through. Refer back to
FIGURE
03A-02
.
5.
Route cables to each Carburetor leaving slack to allow for engine
movement and maintenance of carburetor.
NOTE: Choke Control can be
pulled out slightly to allow trimming of Control Cable housings.
6.
Cut provided Blue Line into segments and secure with Plastic Ties to
secure the Throttle and Choke Cable housings together.
7.
Insert Barrel Stop into choke control arm and thread Control Cable
through. Refer to
FIGURE 03H-07
. Adjust to allow full off (down) position
when control is pushed all the way in and tighten Set Screw in Barrel Stop.
HINT: Turn Adjustable Ferrule out slightly to allow easier adjustment.
Lock
Adjustable Ferrule with lock nut.
8.
Safety wire Cable housing to Adjustable Ferrule and check for operation.