19
Top Roller
65) Pull conveyor leg out of holders and re-intall in top tube only, place lower conveyor in place and install 2 mount
bolts, do not over tighten, conveyor must be able to swing up and down freely
66) Unscrew top roller tensioner
67) Put Conveyor top section in place