Operating concepts
R&S
®
NRP Series
40
Getting Started 1419.0170.02 ─ 16
Setup
NRP
3-Path Diode Power Sensor
MHz to GHz, 100 pW to 200 mW (−70 dBm to +23 dBm)
SMART SENSOR TECHNOLOGY
1
2
3
4
5
6
Figure 5-3: Setup with the R&S
Power Viewer
1 = Signal source
2 = R&S NRP power sensor
3 = Host interface connector
4 = R&S
NRP
‑
ZKU cable
5 = USB connector
6 = Computer with installed R&S
Power Viewer
1.
NOTICE!
Incorrectly connecting or disconnecting the power sensor can dam-
age the power sensor or lead to erroneous results. Ensure that you connect or
disconnect the power sensor as described in
Connect the power sensor to the signal source.
2. Connect the cables as shown in
For a detailed description, refer to
Chapter 3.7.1.1, "Simple USB connection"
Starting a measurement
For a detailed description, refer to the operating manual of the R&S
Power
Viewer. The manual is installed automatically during the installation of the
R&S
Power Viewer.
1. Start the R&S
Power Viewer.
2. Execute zeroing.
Note:
Turn off all measurement power signals before zeroing. An active mea-
surement signal during zeroing causes an error.
3. Switch on the test signal of the signal source.
4. Select a measurement.
R&S
Power Viewer