Set-ups for the verification of parameters are shown in the next figures. All
measurements are performed on a ground plane which exceeds the set-up at least by
20 cm on each side. A well ground connection must be established between network
and balance measuring bridge.
All free connections of the networks must be terminated with a 100
C
resistor for
verification of the longitudinal conversion loss (LCL).