
Preparing for Use
R&S
®
ENV216
23
User Manual 5201.6693.14 ─ 04
1 = Metal wall, at least 2 m x 2 m
2 = Equipment under test
3 = Cable in folded configuration
4 = Two-Line V-Network
5 = Shielded connection cable
6 = Test receiver
B = Reference ground connection
M = Test receiver connector
P = Test device connector
Devices under test that have a separate ground connection and are not connec-
ted by integral grounding conductors are grounded using an additional connection
cable. This is inserted into the ground connector (1) to the right of the test device
socket and runs parallel to the mains cable.
Measurement Setup