Sample Application
R&S
®
DVMS1
37
Getting Started 2113.7619.02 ─ 12
1. In the toolbar, click "View Selector".
2. In the "View Selector" dialog, click the icon for the Table/PES/T2
‑
MI interpreter.
3. Under "INPUT", expand the PSI/SI node and select the PAT element.
1 = Network PID (NIT) referenced by program number
=
0
2 = Program map PID (PMT) referenced by program number
≥
1
The results pane shows the content of the PAT in tabular form.
For details, see user manual or help system, "program association table (PAT)".
Performing the Measurement