R
AM 3
000 U
L
- 3100 U
L
- 3200 U
L
6
www.ramsetinc.com
RAMSET
INSTALLATION SPECIFICATIONS
CONCRETE PAD CONSTRUCTION:
Dimensions given for the pad are based on soil
bearing shear of 2000 P.S.F. These figures may
have to be adjusted depending on local soil
conditions.
1. Construct form for mounting pad according to
dimensions shown in Figure 1 and 2.
2. Locate mounting pad according to dimensions
given in illustration.
3. Level top edge of form.
4. Set reinforcing bars and wire mesh.
5. Allow pad to cure for 48 hours, and remove
forms.
6.
Note: conduits 6" above concrete pad.
Figure 2
Figure 1
R_Ramset_Ram3000.qxd 8/19/05 4:57 PM Page 8
Содержание RAM 3000 UL
Страница 1: ...FOR CLASS I II III IV VEHICULAR GATE OPERATORS R_Ramset_Ram3000 qxd 8 19 05 4 56 PM Page 1...
Страница 2: ...www ramsetinc com R_Ramset_Ram3000 qxd 8 19 05 4 56 PM Page 2...
Страница 27: ...www ramsetinc com R_Ramset_Ram3000 qxd 8 19 05 4 58 PM Page 27...
Страница 28: ...R_Ramset_Ram3000 qxd 8 19 05 4 58 PM Page 28...