INSTALLATION SPECIFICATIONS
CONCRETE PAD CONSTRUCTION:
Dimensions given for the pad are based on soil
bearing shear of 2000 P.S.F. These figures may
have to be adjusted depending on local soil
conditions.
1. Construct form for mounting pad according to
dimensions shown in Figure 1 and 2.
2. Locate mounting pad according to dimensions
given in illustration.
3. Level top edge of form.
4. Set reinforcing bars and wire mesh.
5. Allow pad to cure for 48 hours, and remove
forms.
Outside Property
.,
Inside Property
j
0
Gate Closed
See Fig, 5, 6, or 8
for d.lstanoe of pad
Gate Opened
/
CONDUIT FOR MASlEAISLAVE
6.
Note: conduits 6" above concrete oad
,
6
l#H
1
hil
ALLOW 2" ABOVE
GROUND LEVEL
MINIMUM FOR
LEVELING.
GROUND LEVEL
!
DEDICATED CONDUIT
WITH 15 amp BREAKER
I •
112" REDHEAD
ANCHOR BOLTS 4X
18"
l
I
25"
24"
ELECTRICAL
CONDUIT FOR
MAS TER/SLAVE
www.RamsetStore.com | (800) 878-7829 | [email protected]