© 2005 SANDVIK TAMROCK CORP.
Page 26 - OPERATION
Operation
S 83 STD
20. Do not operate the hammer with the carrier's boom, stick or bucket cylinders at
the end of their stroke (either fully extended or fully retracted). Damage to the
carrier may result.
21. Do not use the hammer or hammer tools for lifting. Lifting eyes on the hammer
are for storage and maintenance purposes only.
22. The tool shank must be well greased during operation. Regular visual inspec-
tions during operation are recommended. An unlubricated tool shank requires
more frequent greasing intervals. A tool shank covered with excessive grease
requires less frequent greasing intervals.
Содержание S 83 STD
Страница 1: ...3 05 OPERATION AND MAINTENANCE OMS83SENG 305 HYDRAULIC HAMMER RAMMER S 83 STD ...
Страница 3: ...OPERATION Page 3 2005 SANDVIK TAMROCK CORP S 83 STD OPERATION ...
Страница 30: ... 2005 SANDVIK TAMROCK CORP Page 30 OPERATION Operation S 83 STD ...
Страница 31: ...LUBRICATION Page 31 2005 SANDVIK TAMROCK CORP S 83 STD LUBRICATION ...
Страница 39: ...MAINTENANCE Page 39 2005 SANDVIK TAMROCK CORP S 83 STD MAINTENANCE ...
Страница 53: ...SPECIFICATIONS Page 53 2005 SANDVIK TAMROCK CORP S 83 STD SPECIFICATIONS ...
Страница 55: ...SPECIFICATIONS Page 55 2005 SANDVIK TAMROCK CORP Hammer specifications S 83 STD 1 2 MAIN DIMENSIONS ...
Страница 57: ...Page 57 2005 SANDVIK TAMROCK CORP ...