background image

© Raita Environment 2020

17   (18)

ENGLISH

SUOMI

SVENSKA

ENGLISH

Installation, generally

Content of the delivery, accessories 

Piping, ventilation

Installation posibilities
Use, generally

Controll, service, to clean the filters     

Raita 

  

 

HS Bio

 
MANUAL  -  USING   
 

(18)

SUOMI

SVENSKA

ENGLISH

Installation, generally

Content of the delivery, accessories 

Piping, ventilation

Installation posibilities
Use, generally

Controll, service, to clean the filters     

Use, generally

 

Neglecting the care can cause HS Bio cleaner to malfunction and to drain the wastewater incompletely. As a result, the 
property's wastewater can contaminate the environment and groundwater, cause serious health risks, spread disease 
and unpleasant odors.
 
BDT drainage occurs when using water in the bathtub, in the shower, in the kitchen in connection with cooking, during 
washing and for the washing machine. One resident produces about 40-100 BDT water per day.
 
The wastewater consists mostly of dissolved organic and inorganic substances, organic load (BOD). If the waste water is 
discharged into the surface water, the groundwater or the soil, it entails environmental and health risks.
 
Care must be taken that no substances that can harm the function of the BioBox XL cleaner come into the system, such 
as medicines, cigarette butts, napkins, diapers, condoms, large amounts of milk or fat, stoppers, chlorine, antibacterial 
detergents,solvents, oils, paint or other waste.
 

Содержание HS Bio

Страница 1: ...Raita Environment 2020 SUOMI 1 6 SVENSKA 7 12 ENGLISH 13 18 Raita HS Bio MANUAL...

Страница 2: ...me l ytyy my s verkkosivuiltamme katso linkki https raita com domestic hs htm Sielt l yd t tietoa Puhdistustehokkuudesta Tekniset piirustukset Asennusohjeet Huolto ja k ytt ohjeet Lis tietoja saat ott...

Страница 3: ...2 Bio suodattimet kaivoon asennettuna 3 K ytt ohjeet ja asennuskuvat 4 Pakattuna muovikelmuun Mahdollisia lis laitteita HS Bio j rjestelm n Lis laitteiden asennusohjeet niiden toimituksissa lis suodat...

Страница 4: ...iit nt n D110 mm HS Bio n l htev liitos on D110 mm Laitteelta poistuva vesi johdetaan n ytteenottokaivon kautta avo ojaan tai imeytyskaivon kautta maahan Jos kiinteist ll on viem rituuletus 1 rakennuk...

Страница 5: ...ttaessa ankkuroidaan puhdistamo ankkurointi kehyksell ja tarvittaessa ankkurointikankailla Asennus yleist Toimituksen sis lt lis laitteet Putkiliit nn t ilmanvaihto Asennustavat K ytt minen yleist Huo...

Страница 6: ...noin 40 100 litraa p iv kohden J tevesi koostuu liuonneista orgaanisista ja ep orgaanisista mikro organismeista J teveden johtaminen pintavesiin pohjaveteen sek maaper n johtaa ymp rist ja terveysris...

Страница 7: ...ellisesti t ytyy suodattimet puhdistaa Huolto Sakokaivojen huolto loka autolla tai SAV lietekuivaimella Suodattimien huolto Biokasvustoa poistetaan harjaamalla yl snostetut suodattimet esim kompostin...

Страница 8: ...r utan problem Det mesta informationen av HS Bio reningsverks teknik anv ndning service har vi samlat i v r internetsida se l nken https raita com domestic hs htm D r hittar du bland annat information...

Страница 9: ...io leveransens inneh ll 1 Tankar teknisk utrymme luftpump 2 Biofilter installerade i processtanken 3 Bruksanvisning och installationsritningar 4 F rpackad M jliga tillbeh r f r HS Bio systemet Install...

Страница 10: ...tas till HS Bio inloppet D110 mm HS Bios utg ende anslutning r D110 mm Vattnet som l mnar enheten leds genom provtagningsbrunnen till den ppna diket eller genom infiltreringbrunnen till marken Om fast...

Страница 11: ...marken v rmeisolering HS Bio anl ggningen installeras vanligtvis in i marken Reningsanl ggningen m ste skyddas fr n frysning genom att isolera det med ett horisontellt installerade v rmeisoleringsskiv...

Страница 12: ...a 40 100 BDT vatten per dag Avloppsvattnet best r mesta dels av l sta organiska och oorganiska mnen organisk belastning BOD Om man leder ut avloppsvattnet i ytvattnet grundvattnet eller marken medf r...

Страница 13: ...eningsverket fr n markeringarna p kanten av tanken i processtanken Efter 400 dagars anv ndning eller om vattenniv n i processbrunnen har varit h gre rekommenderar vi att du reng r filtren Service T mm...

Страница 14: ...By following these installation instructions the mini purifier is properly installed and works without problems Most of the information about HS Bio treatment plant technology use service we have col...

Страница 15: ...Bio content of the delivery 1 Tanks technical room air pump 2 Biofilters installed in the process tank 3 Operating instructions and installation drawings 4 Packed Possible accessories for the HS Bio...

Страница 16: ...to the HS Bio inlet D110 mm HS Bio s outgoing connection is D110 mm The water leaving the unit is passed through the sampling well to the open ditch or through the infiltration well to the ground If...

Страница 17: ...on in the ground thermal insulation The HS Bio plant is usually installed in the ground The treatment plant must be protected from freezing by isolating it with a horizontally installed thermal insula...

Страница 18: ...he environment and groundwater cause serious health risks spread disease and unpleasant odors BDT drainage occurs when using water in the bathtub in the shower in the kitchen in connection with cookin...

Страница 19: ...s on the edge of the tank in the process tank After 400 days of use or if the water level in the process well has been higher we recommend that you clean the filters Service Empty the sludge from the...

Отзывы: