16 (18)
ENGLISH
(18)
Content of the delivery, accessories
Installation posibilities
Use, generally
Controll, service, to clean the filters
Raita
HS Bio
MANUAL - INSTALLATION
Installation; into the ground, thermal insulation, installation inside the building
1. Installation in the ground, thermal insulation:
The HS Bio plant is usually installed in the ground. The treatment plant must be protected from freezing by isolating
it with a horizontally installed thermal insulation board.
When installed in the ground, HS Bio must be anchored with a frame around the treatment plant and, if necessary,
with anchortexstiles that are included in the delivery.
2. Installation inside a building (eg in a separate building or in the basement):
The HS Bio plant can also be installed, for example in a basement or in a separate
building.