background image

          11

GB

OVERVIEW OF REMOTE OPTIONS

Remote control

WiFi module

(optional)

INTRODUCTION

OVERVIEW OF ELECTRONIC COMPONENTS

GV60 combination valve

Receiver

Light module 

and adapter 12V

PUCK

(optional)

Содержание Visio 100 RD

Страница 1: ...VISIO GAS INSTALLATION MANUAL GB VISIO 100 RD VISIO 100 T...

Страница 2: ...1st edition 10 05 2023...

Страница 3: ...Remote control Balanced flue system Positioning flue terminals Placement and construction Distance to combustible material Fitting the frame optional Starting the gas fireplace Purging the gas pipe P...

Страница 4: ...t of this manual before installation Pay special attention to the safety chapter and the included manuals Make sure you understand the instructions otherwise please contact your RAIS dealer Follow the...

Страница 5: ...otice or caution Visual sign illustrating a potential hazard INSTRUCTIONS FOR USING QR CODES You will find QR codes with links to video guides for different installations in several places within the...

Страница 6: ...kshavn Danmark 18 2575 Visio Gas 100 RD Visio Gas 100 T VISIO 9 0359 C11 C31 C91 Gas category and supply pressure Input Hi kW Output Hi kW Burner pressure high Hot Country of destination L P G I3 28 3...

Страница 7: ...rmation label correspond to the gas type and supply pressure to which the appliance will be connected Install the appliance in accordance with the following instructions and the national and local app...

Страница 8: ...n airflow around the unit is necessary Do not use fiberglass rockwool or any other sort of insulation material as this can create pungent odour and can produce discolouration of the fireplace Make sur...

Страница 9: ...30 0 3 10 50 30 120 0 9 0 6 3 6 TILLADTE AFVIGELSER FOR LINIE RE M L AFVIGELSE I MM 0 1 0 1 VINKELAFVIGELSE KORTESTE SIDE 0 5 3 pr 100 mm OV UV DELIVERY PACKAGING The fireplace is supplied secured to...

Страница 10: ...hamber and fine tuning of airflow and flame image CONTENTS 1 Logs qty 10 Please note that two of the ceramic logs must not be used 2 Filaments 1 bag 3 Secondary burners qty 2 4 Restrictors 0 mm 35 mm...

Страница 11: ...11 GB OVERVIEW OF REMOTE OPTIONS Remote control WiFi module optional INTRODUCTION OVERVIEW OF ELECTRONIC COMPONENTS GV60 combination valve Receiver Light module and adapter 12V PUCK optional...

Страница 12: ...ns on page 30 for installing electrical and gas components including a guide for synchronisation of the remote control and receiver BALANCED FLUE SYSTEM Read an introduction to the balanced flue syste...

Страница 13: ...ls Do not install the fireplace against a flammable rear wall Protect the ceiling if it is made of flammable material Comply to the fireproof distances stated in this manual See the exact distances on...

Страница 14: ...ASS The gas fireplace comes with the glass fitted The glass must be removed to install the fireplace burner The frames must be removed before removing the glass 1 Find the two rotary flaps at the top...

Страница 15: ...the two metal edges on the glass and pull the glass towards the front 4 Lift the glass until it is free of the base frame Tilt the bottom of the glass out and then down 5 The glass can now be removed...

Страница 16: ...The position indicator is positioned in the top of the fireplace frame see the arrow INSTALLATION NOTE There is a position indicator in the middle of the gas fireplace frame which ensures the glass i...

Страница 17: ...Make sure that the correct air settings have been made if not please make the necessary adjustments Follow the guide below for air setting natural gas or LPG INSTALLATION AIR SETTINGS FOR NATURAL GAS...

Страница 18: ...hat the bottom bolts are tightened and that the burner is pressed against the bottom combustion chamber gasket 3 Remove the four fitted bolts on the bottom of the fireplace see the arrows PROCEDURE 1...

Страница 19: ...st be mounted with the pilot flame towards the front of the appliance If the exhaust is to the right see the red circle the pilot is in front 5 Now pull the GV60 Combination Valve pipe and receiver to...

Страница 20: ...20 GB INSTALLATION OVERVIEW OF THE BURNERS Secondary burner Piezo electrode Main burner 1st thermocouple Pilot flame guide...

Страница 21: ...the fireplace it must be ensured that the cross ignition from the pilot flame to the main burner functions and that ignition occurs easily with the secondary burners Pilot flame 2nd thermocouple for...

Страница 22: ...ogs must be used INSTALLATION 1 2 3 4 5 6 7 8 A small elevation in log no 7 can be used for identification 1 Start by securing the two secondary burners in the fireplace s base plate NOTE The tip of t...

Страница 23: ...23 GB 2 5 5 cm 6 5 cm 6 5 cm 10 cm 7 cm 1 5 5 cm 2 Start from the opposite side of the pilot flame and place ceramic log no 1 3 Place ceramic log no 2 so that it rests on log no 1 INSTALLATION...

Страница 24: ...24 GB 7 cm 7 cm 4 Place ceramic log no 3 5 Then place ceramic log no 4 on the secondary burner to the left 13 cm 5 5 cm 4 cm 3 4 INSTALLATION 1 cm...

Страница 25: ...25 GB INSTALLATION 7 cm 7 cm 6 Place ceramic log no 5 on the other secondary burner to the right 7 From the opposite side place ceramic log no 6 5 6 8 cm 21 cm 5 cm...

Страница 26: ...26 GB INSTALLATION 7 cm 7 cm 8 Place ceramic log no 7 9 Place ceramic log no 8 10 cm 7 8 2 5 cm 10 cm 1 cm 9 cm 20 cm 1 5 cm...

Страница 27: ...in total on both sides of the gas fireplace over the LED lights It is important that the pieces of glass are distributed in a thin layer that just exactly covers the holes in the bottom of the firepl...

Страница 28: ...both the glass pieces and the rest of the base plate WARNING Be aware that the main burner and pilot flame are kept free of all ornaments INSTALLATION 14 Place the filament on the main burner for an...

Страница 29: ...after 20 minutes the flames should be a clear yellow If the desired combustion is not achieved another restrictor can be installed The restrictors come in three different sizes INSTALLATION RESTRICTO...

Страница 30: ...TION INSTALLATION OF ELECTRICALAND GAS COMPONENTS CONNECTION DIAGRAM Use the diagram to get an overview of the individual electrical and gas components Pictures of the parts will be provided on the fo...

Страница 31: ...ilure four AA batteries can be fitted in the receiver If batteries are used in the receiver the LED light and WiFi module will not operate LED box Power supply adapter 12V Receiver WARNING The power s...

Страница 32: ...lve is 12 mm 3 8 Secure against leaks in all gas connections made Make sure that the gas is correctly connected Always install a stopcock and a measuring stud before the GV60 Combination Valve The sto...

Страница 33: ...ut during e g service and maintenance The inspection grate also functions as a convention grate The retractable inspection grate is available in two different sizes Small inspection grate front 60 cm2...

Страница 34: ...ton You now have 20 seconds to press the down ar row button on the remote control Hold the but ton in until you see the word conn on the remote control Then release the button 3 The remote will then c...

Страница 35: ...adapter needed 130 200 Natural Draught Ontop Metalotherm USD system No adapter needed 130 200 Natural Draught M llink Grol Multi Vent system Adapter needed 130 200 Natural Draught Poujoulat DUOGAS sy...

Страница 36: ...g the terminal 600 L From an opening in the car port e g door window into the dwelling 1200 M Vertically from a terminal on the same wall 1500 N Horizontally from a terminal on the same wall 300 P Fro...

Страница 37: ...lace a measuring spigot can be positioned here Make sure that the fireplace is completely insulated from combustible materials on all sides We recommend protecting the ceiling and floor with non combu...

Страница 38: ...mm to combustible material Make a protecting plate if the ceiling is combustible Non flammable materials Outlet convection Min 300 mm from the ceiling Min 150 mm from the back frame to combustible ma...

Страница 39: ...B B A A B B Non flammable materials Combustible material Min 500 mm to combustible material Min 150 mm from the back frame to combustible material Keep a free distance around the fireplace of 50 mm t...

Страница 40: ...Min 250 mm 150 mm Min 300 mm 200 mm Min 350 mm 250 mm Min 400 mm 300 mm Min 450 mm INSTALLATION A B If you want to position flammable material above your fireplace you must follow these minimum requi...

Страница 41: ...LLATION DISTANCE FROM GLASS TO COMBUSTIBLE SIDE WALL Combustible material Non flammable material Fireplace opening Fireplace opening Min 150 mm between edge of opening and wall 0 25 50 75 100 mm 125 1...

Страница 42: ...ection 2 Natural convection 3 Outlet convection 4 Roof terminal 5 Wall terminal 6 Ceiling protection The installation of Visio 100 RD and Visio 100 T must be fitted with convection openings which have...

Страница 43: ...14 PROCEDURE TO FIT THE FRAME 1 Fit the frame in the top of the gas fireplace using the accompanying screws see the arrows 2 Place the bottom frame the magnets ensure that the frame is secure 3 Place...

Страница 44: ...may cause condensation and fog the glass This condensation is normal and will disappear within 10 15 minutes as the glass and flue heats up Do not turn off the fireplace before all dew on the glass is...

Страница 45: ...that the secondary burners remain lit 7 Switch off the fireplace completely The fireplace may only be ignited again after the thermocouple has cooled down This will take about 1 2 minutes INSTALLATIO...

Страница 46: ...by removing the plug for the pressure regulator 5 Turn off the fireplace to minimum load 6 The minimum burner pressure can be adjusted by the screw minimum rate orifice 7 After the pressure test is co...

Страница 47: ...kly on the remote control CO measurement on minimum load 1 Push the until the secondary burners are shut off 2 Put the fireplace in minimum load by pressing twice quickly on the remote control There a...

Страница 48: ...ve the secondary burners Remove the perforated plate 6 Vacuum the entire burner 7 If needed soot on the logs can be removed by a soft brush Clean the pilot burner assembly using a soft brush and a vac...

Страница 49: ...checked for blockages Check the outside and inside of the fireplace for any damage and pay particular attention to gaskets Only original RAIS spare parts may be used CLEANING THE CERAMIC LOGS 1 Remov...

Страница 50: ...he installation instructions or used according to the user manual In case of failure to comply with statutory or recommended installation regulations and in the event of any owner made changes to the...

Страница 51: ...es not work Check the thermocouple with an ohmmeter Are the main and secondary burners burning for more than 30 seconds before it turns off Is there a flame by the ceramic logs 2nd thermocouple is int...

Страница 52: ...No spark Reversed polarity in 1st thermocouple wiring Incorrect pilot orifice if valve has been converted from LPG to NG or vice versa F09 Fire is not responding No electric control of the fire The do...

Страница 53: ...rrectly installed F13 F13 Contact Service Motor turns to pilot position Receiver temperature exceeds 80 C F14 F14 Contact Service 5 sec beep from the receiver Fire is not responding no ignition Receiv...

Страница 54: ...mbar 9 9 7 9 27 5 24 8 30 3 BE BG CY DK EE FI FR GB GR HR HU IT LT MT NL NO RO SE SI SK TR I3B P 50 G30 G31 50 11 2 8 9 36 32 4 39 6 AT CH CZ DE FR SK N A T U R A L G A S I2H I2E G20 20 mbar 8 1 6 5 1...

Страница 55: ...is switched on Been burning for 45 minutes Single burner The appliance is switched on Been burning for 45 minutes 130 mm 200 mm Type of burner 3243514 Gas category I2H I2E I2ELL I2E I2L I2EK I2 Inter...

Страница 56: ...minutes Single burner The appliance is switched on Been burning for 45 minutes VISIO 9 Producer Model Interval Interval Concentric approvals Interval Interval Country code AT CH CZ DE NL SK Gas catego...

Страница 57: ...490 145 60 1218 5 1102 5 320 5 320 5 DRAWINGS VISIO 100 RD A A A A RA 1159 993 837 886 377 446 n 1 9 9 n 1 3 1 189 999 478 641 490 145 60 1218 5 1102 5 320 5 320 5 With frame Without frame 542 837 83...

Страница 58: ...7 886 n199 n131 189 478 984 641 490 145 60 320 5 320 5 1122 1024 A A A A 1173 993 377 837 886 n199 n131 189 478 984 641 490 145 60 320 5 320 5 1122 1024 With frame Without frame 837 542 1173 837 1024...

Страница 59: ......

Страница 60: ...RAIS A S Industrivej 20 DK 9900 Frederikshavn Denmark www rais com...

Отзывы: