ENGLISH
RAIS manual for Rais 700
15
It is possible to order ‘made to measure’ frames.
Contact your Rais dealer.
A
A
Lift the stove from the pallet to the place of installation on to a suitably protected floor.
The stove can be mounted on the optional adjustable stand ( see page 29 ).
These are available to order from your local Rais dealer / stockist.
Using a spirit level against the door and body of the stove, ensure that the stove is
perfectly level and make adjustments using the levelling bolts in the base.
Remove the frame and door from the stove. Be careful not to damage the glass or
paint.
Seal the flue pipe on to the flue outlet using fire cement and self tapping screws and
connect to the chimney.
Connect the convection air ducts, if required.
Install air system manifold kit ( A ) to the pipe stub, if required ( optional ).
The stove is now ready to be built in using either stud walls or solid walls.
When the walls have been finished and decorated, the frame and door can be
refitted. Remove all protective plastic and tape prior to commissioning.
Содержание 700
Страница 2: ...ENGLISH RAIS manual for Rais 700 2...
Страница 9: ...ENGLISH RAIS manual for Rais 700 9 Flue Outlet Positions...
Страница 11: ...ENGLISH RAIS manual for Rais 700 11...
Страница 12: ...ENGLISH RAIS manual for Rais 700 12...
Страница 17: ...ENGLISH RAIS manual for Rais 700 17 Insulate ceiling if necessary...
Страница 19: ...ENGLISH RAIS manual for Rais 700 19...
Страница 20: ...ENGLISH RAIS manual for Rais 700 20...
Страница 33: ...ENGLISH RAIS manual for Rais 700 33...