2.1 Plan the installation
Ensure that…
1. The
Chemflo
feeder is installed in a sheltered location.
2. The
Chemflo
controller is close enough to the expected location of the Injection Tee for the
pump output tubing to reach without straining.
3. The maximum suction height from the bottom of the chemical drums to the dosing pump is 2
metres.
4. The mains power leads from the
Chemflo
and the Pool Pump reach a mains power outlet. If
the controller is mounted in a wet area, a weatherproof power outlet must be used. It is
recommended that you use an earth leakage circuit breaker with this power outlet. Please
consult a qualified electrician if you are not sure if this is fitted.
5. Install the Injection Tee
Install the Injection Tee as per the diagrams below. Use a suitable PVC joining compound. The
Tee is installed in the return line to the pool, as the pressure is lower.