background image

8.2 Start-Up

Connect the pumping system for the water inlet

Make sure that the Operation Conditions (pressure, temperature, flow rate and pH) are in

accordance with the specifications.

Monitor the equipment head loss.

Follow the instructions of the Equipment's Controller Manual.

13

8. OPERATION INSTRUCTIONS

8.1 Before Starting-Up

Before operating the equipment, use adequate personal protection (proper clothes, safety

glasses, gloves and other elements of personal protection).

Make sure that the flow rate, pressure, temperature and PH are permitted by the equipments

specifications (indicated in the equipment technical data) before starting up. Do not operate
outside of the recommended working conditions.

Equipment Pressure: Make sure that the filter is depressurized before opening it.

Make sure that all the filters are properly closed to avoid leaks. Do not forget to lock the

safety clip on the clamp. This will prevent accidental opening

Make sure that the auxiliary filter key is opened

before starting-up the equipment

We recommend the installation of an upstream and downstream valve to isolate the system

during maintenance operations.

1.

Place the correct number of discs on each filter.

2.

Adjust it until the filter base is straight

3.

Install the lid.

4.

Close the clamp.

5.

Check the adjustment of the cap of each filter.

6.

The filter battery is ready to operate.

Содержание HDF 1X2

Страница 1: ...1X2...

Страница 2: ...g the Height of the Equipment 10 6 3 Securing the Equipment 10 6 4 Connection of the main manifolds inlet outlet and drainage 10 7 Control Unit Connection 10 8 Operation Instructions 10 8 1 Before Sta...

Страница 3: ...s only use all necessary security and accident prevention methods to guarantee your security The improper use of the equipment may cause injury to people damage to property or the environment Improper...

Страница 4: ...the instructions described in this manual Do not open the filter clamp when the equipment is pressurized it could cause serious injury to people the equipment or to the surrounding area Do use adequa...

Страница 5: ...DF Disc Filters systems are subject to strict quality control tests and are manufactured under a production process which complies with the requirements of ISO 9001 2000 Rain Bird is committed to the...

Страница 6: ...s responsible for collecting the filtered water and carrying to the exterior Rain Bird HDF 1X2 Disc Filters consists of a filtering element comprised of grooved discs that allows the retention of part...

Страница 7: ...exerted by the spring on the discs stack generating a decompression due to the piston displacement raising The release of the discs creates rotation due to the tangential projection of the water comin...

Страница 8: ...pment Serial number Max Pressure Year of Manufacturing Manufacturer Model Max Temperature 5 1 Assembly Part Identification COMPONENTS N DESCRIPTION 1 RAIN BIRD HDF DISC FILTER 2 INLET MANIFOLD GROOVED...

Страница 9: ...E 14 15 16 13 10 11 12 7 N DESCRIPTION CHECK VALVES WITH ACCESORIES SET OF PISTON GASKETS SPRINGS MAINTENANCE KIT FILTERING ELEMENT O RING FRAME FRAME O RING PISTON GASKET 10 PISTON SPRING 1 1 11 PIST...

Страница 10: ...ent dimensions the shoulders height should be adjusted so that the upper part of the drainage manifold is placed at a distance of 33 2 843 mm from the ground The separation between the shoulders shoul...

Страница 11: ...inage manifold has a PVC grooved coupling from factory that glues to a 3 PVC pipe Connect the inlet outlet and drainage manifolds with its corresponding connections LEVEL AND SECURE TO THE GROUND TO A...

Страница 12: ...P1 High Presure L1 E1 E1 T PRESSURE T PRESSURE The microtubes and unions are labelled according to the following nomenclature 12 7 CONTROL UNIT CONNECTION P1 and P2 are the pressure in the inlet and o...

Страница 13: ...cated in the equipment technical data before starting up Do not operate outside of the recommended working conditions Equipment Pressure Make sure that the filter is depressurized before opening it Ma...

Страница 14: ...their installation DAILY ACTION 1 Visual inspection of the equipment 2 Check for leakage in the equipment 3 Check the Operation Conditions pressure temperature flow rate PH 4 Evaluation of the equipm...

Страница 15: ...lean only the discs in an acid solution If an acid solution is used to clean the discs use the adequate protection clothes glasses gloves face shield Consult the Safety Sheet of the product used Do no...

Страница 16: ...ws manually and then use the wrench 5 Lubricate the base of the filter element O ring with a product chemically compatible with the material of the filter Insert the filtering element pushing carefull...

Страница 17: ...II Apply grease to the coupling joint III Assemble the coupling 17 B Checking the Intake Filters I Disconnect P1 and P2 micro tubes II Remove the intake filters on the inlet and outlet manifolds with...

Страница 18: ...ve any doubt contact your distributor WATER IN THE DRAINAGE MANIFOLD CONTROLLER FILTRATION PROCESS INSPECT EACH OF THE COMMAND MICROTUBES WHICH FEED THE HYDRAULIC VALVES CHAMBERS CHECK THE CORRESPONDI...

Страница 19: ...ime of each station from the PROBLEM WITH THE DIFFERENTIAL PRESSURE GAUGE CHECK THE REGULATED VALUE IN THE DIFFERENTIAL PRESSURE GAUGE See section Differential Pressure Gauge Delay from the Control Un...

Страница 20: ...ases or chemicals unless these materials and their concentrations are specified in the Rain Bird quotation 6 Electrical supply voltages above or below those specified for correct Filtration Products o...

Страница 21: ...oration Tel 520 741 6100 Fax 520 741 6191 E mail Filters Rain Bird com http www RainBird com Request your spares to RAIN BIRD DISC FILTER ASSY DISC Series User s Manual 2013 00 21 4 2 Identification o...

Отзывы: