2
RailKing GG-1 Electric Engine
Table of Contents
Initial Lubrication
3
Basic Operation
3
Throttle
3
Operation Buttons
3
Volume Control
4
Proto-Sound 2.0 Operation
4
Activating Proto-Sound 2.0 Conventional Mode Features
4
Passenger Station Announcements (PSA)
5
Tips on Using PSA
6
Proto-Coupler
®
Operation
7
Speed Control
7
Lock into a Direction State
8
Reset to Factory Defaults
8
Automatic Sounds
8
Maintenance
9
Lubrication and Greasing Instructions
9
Cleaning the Wheels, Tires and Track
10
Locomotive Traction Tire Replacement
11
Locomotive Light Bulb Replacement
13
Self-Charging Battery Back-Up
14
Troubleshooting
15
Compatibility
17
Transformer Compatibility Chart
18
Additional Features with DCS Remote Control System
19
Safety Precautions
20
Service and Warranty Information
25