4 RailKing Dreyfuss Steam Engine
Checking The Battery
You may find, if your locomotive was built several months before you set it up, that the
rechargeable battery has run down and needs to be charged before operating. If you
notice that the sounds are garbled, test and charge the engine as described in the
"Self-Charging Battery Back-Up" on page 16.
Placing The Engine On The Track
Place the engine on the track, then insert the reverse unit plug that extends out of the
tender into the receptacle at the back of the boiler cab (Figure 3.
WARNING: DO NOT
CONNECT THIS ENGINE TO A TENDER FROM ANOTHER ENGINE; IT MAY
CAUSE SERIOUS DAMAGE.
Look at the bottom of the engine and tender where each
will have a color-coded stamp. If they
match you may connect those two
pieces; if not, don’t.
Connect the draw bar between the
engine and tender. The draw bar hole
located farthest from the tender is for
applications such as display. The
second hole is for normal operation on
the track.
At this point, you are ready to begin
running your engine.
Plug Tender Plug into
Boiler Socket at back of cab.
Figure 3: Connecting Tender Hanress