
Operator’s Manual
© Copyright 2018 - Rail-Ability Limited
Page
55
of
70
Conversion
21.9.4 Stow
Press the stow button. All of the incorrect functions and movements will then be disabled to assist the
operator.
21.10 After Each Use
Perform the following steps at the end of every work shift.
1.
Ensure the boom is fully stowed.
2.
Off-Track the machine.
3.
Park the machine on a firm level surface, clear of obstruction and traffic at least 3 metres away
from the nearest railway lines.
4.
Turn off the ignition, remove the keys and lock both cab doors to secure from unauthorised use.
21.11 On and Off Tracking
Carry out the following in the order shown.
1.
Drive forwards and align the machine parallel to the track.
2.
Reverse the machine at 30° to the track from the parallel position to traverse the track.
3.
Track Access Ramps are provided on the machine and should be deployed at the positions that
the wheels will contact the rails.
4.
Straddle the track and align the rear rail axle with the track.
5.
Deploy the rear rail axle to only just lift the rear wheels slightly clear of the rail head.
20m
12m
0m
3m
R12m
0m
18m
22m
25m
12m
8m
NOTE:
The dimensions
shown here are
approximate and
given for
guidance only.